The Majestic Shower Company Limited
Two North Place, Edinburgh Way, Harlow, Essex CM20 2SL England
Tel44 (0) 8448 001 500
Fac44 (0) 1279 635 074 [email protected] www.majesticshowers.com
7
9
10
If the vertical wall profile is too long, cut it to length and file the cut end smooth.
Run a bead of silicone along the wall side of the vertical profile, as shown. Screw it in
place.
Apply a generous amount of silicone on the inside of the channels where they meet in
the corner to prevent water penetration.
Ensure that the rubber strip is in place in the underframe channel in the position
to be occupied by the In Line panel. Trim it at the end of the panel position so that
it does not extend into the door position.
Loosely screw the Glass to Wall brackets to the wall.
Run continuous beads of silicone along the inside of the vertical wall profile and the
In Line panel position in the Underframe channel, as shown.
Rio Installation Guide - Surface Profiles