Majestic • JADE32IN, JADE42IN, JADE42IL Installation Manual • 2491-986 Rev. K
• 10/18
36
C. Securing and Leveling the Appliance
WARNING! Risk of Fire!
Prevent contact with:
• Sagging or loose insulation
• Insulation backing or plastic
• Framing and other combustible materials
Block openings into the chase to prevent entry of blown-
in insulation. Make sure insulation and other materials
are secured.
DO NOT
notch the framing around the appliance
standoffs.
Failure to maintain air space clearance could cause
overheating and fire.
B. Installing Optional Heat Management
Systems
NOTICE:
Additional clearances are required for heat
management systems
installations. Provisions must be
made in advance to ensure fit within the framing.
• Locate the heat management ports on the left and right
sides of the appliance. Either one or two Heat-Zone
®
-
Gas Kits may be installed.
See Figure 6.2. Remove the
knockouts from the appliance with a tin snips.
• Center the duct collar around the exposed hole and
attach it to the appliance with 3 screws. Note: Do this
BEFORE final positioning of the appliance.
• Determine the location for the air register/fan housing
assembly.
Reference the Heat-Zone
®
-Gas Kit, Smart-Wall™ TV Kit,
Heat-Duct Kit or Heat-Out-Gas Kit instructions for the
remaining installation steps.
Smart-Wall™ TV Kit
When a Smart-Wall™ TV Kit is installed, only one
Heat-
Zone
®
-Gas kit or one
Heat-Out-Gas
kit may be installed.
The
Smart-Wall™ TV Kit can not be used with a power
vent option or optional fan.
The diagram shows how to properly position and secure
the appliance. See Figure 6.5. Nailing tabs are provided
to secure the appliance to the framing members.
• Bend out nailing tabs on each side.
• Place the appliance into position.
• Keep nailing tabs flush with the framing.
• Level the appliance from side to side and front to back.
• Shim the appliance as necessary. It is acceptable to use
wood shims underneath the appliance.
• Secure the appliance to the framing by using nails or
screws through the nailing tabs.
• Optional: Secure the appliance to the floor by inserting
two screws through the pilot holes at the bottom of the
appliance.
Figure 6.5 Proper Positioning, Leveling And Securing Of
Appliance
The JADE32IN, JADE42IN and JADE42IL models ship with
factory-installed non-combustible board. This board must
be used. Do NOT remove. See Figure 6.5.
NAILING TABS
BOTH SIDES
FACTORY-INSTALLED
NON-COMBUSTIBLE BOARD
DO NOT REMOVE