Majestic JADE32IN-B Скачать руководство пользователя страница 6

Majestic  •  JADE32IN-B, JADE42IN-B, JADE42IL-B Installation Manual  •  2619-986 Rev. B  •  10/19

6

I.  Requirements for the Commonwealth of 

Massachusetts

For all side wall horizontally vented gas fueled equipment 

installed in every dwelling, building or structure used in 

whole or in part for residential purposes, including those 

owned or operated by the Commonwealth and where the 

side wall exhaust vent termination is less than seven (7) 

feet above finished grade in the area of the venting, in

-

cluding but not limited to decks and porches, the following 

requirements shall be satisfied:

Installation of Carbon Monoxide Detectors

At the time of installation of the side wall horizontal vented 

gas fueled equipment, the installing plumber or gas fitter 

shall observe that a hard wired carbon monoxide detector 

with an alarm and battery back-up is installed on the floor 

level where the gas equipment is to be installed. In addi

-

tion, the installing plumber or gas fitter shall observe that 

a battery operated or hard wired carbon monoxide detec

-

tor with an alarm is installed on each additional level of 

the dwelling, building or structure served by the side wall 

horizontal  vented  gas  fueled  equipment.  It  shall  be  the 

responsibility of the property owner to secure the services 

of  qualified  licensed  professionals  for  the  installation  of 

hard wired carbon monoxide detectors.

In the event that the side wall horizontally vented gas fu

-

eled equipment is installed in a crawl space or an attic, 

the hard wired carbon monoxide detector with alarm and 

battery  back-up  may  be  installed  on  the  next  adjacent 

floor level.

In the event that the requirements of this subdivision can 

not be met at the time of completion of installation, the 

owner shall have a period of thirty (30) days to comply 

with the above requirements; provided, however, that dur

-

ing said thirty (30) day period, a battery operated carbon 

monoxide detector with an alarm shall be installed.

Approved Carbon Monoxide Detectors

Each  carbon  monoxide  detector  as  required  in  accor

-

dance with the above provisions shall comply with NFPA 

720 and be ANSI/UL 2034 listed and IAS certified. 

Signage

A metal or plastic identification plate shall be permanent

-

ly mounted to the exterior of the building at a minimum 

height of eight (8) feet above grade directly in line with the 

exhaust vent terminal for the horizontally vented gas fu

-

eled heating appliance or equipment. The sign shall read, 

in print size no less than one-half (1/2) in. in size, 

“GAS 

VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OB-

STRUCTIONS”.

Inspection

The state or local gas inspector of the side wall horizon

-

tally vented gas fueled equipment shall not approve the 

installation  unless,  upon  inspection,  the  inspector  ob

-

serves carbon monoxide detectors and signage installed 

in accordance with the provisions of 248 CMR 5.08(2)(a)1 

through 4. 

Exemptions

The following equipment is exempt from 248 CMR 5.08(2)

(a)1 through 4: 
•  The equipment listed in Chapter 10 entitled “Equipment 

Not Required To Be Vented” in the most current edition 

of NFPA 54 as adopted by the Board; and 

•  Product Approved side wall horizontally vented gas fu

-

eled equipment installed in a room or structure separate 

from the dwelling, building or structure used in whole or 

in part for residential purposes. 

MANUFACTURER REQUIREMENTS

Gas Equipment Venting System Provided

When  the  manufacturer  of  Product Approved  side  wall 

horizontally  vented  gas  equipment  provides  a  venting 

system  design  or  venting  system  components  with  the 

equipment, the instructions provided by the manufacturer 

for installation of the equipment and the venting system 

shall include:
•  Detailed instructions for the installation of the venting 

system design or the venting system components; and

•  A complete parts list for the venting system design or 

venting system. 

Gas Equipment Venting System NOT Provided

When the manufacturer of a Product Approved side wall 

horizontally vented gas fueled equipment does not pro

-

vide  the  parts  for  venting  the  flue  gases,  but  identifies 

“special  venting  systems”,  the  following  requirements 

shall be satisfied by the manufacturer:

•  The  referenced  “special  venting  system”  instructions 

shall be included with the appliance or equipment in

-

stallation instructions; and 

•  The  “special  venting  systems”  shall  be  Product  Ap

-

proved by the Board, and the instructions for that sys

-

tem  shall  include  a  parts  list  and  detailed  installation 

instructions. 

A copy of all installation  instructions for all Product Ap

-

proved  side  wall  horizontally  vented  gas  fueled  equip

-

ment,  all  venting  instructions,  all  parts  lists  for  venting 

instructions,  and/or  all  venting  design  instructions  shall 

remain with the appliance or equipment at the completion 

of the installation. 

See Gas Connection section for additional Common-

wealth of Massachusetts requirements.

Note: 

The  following  requirements  reference  various 

Massachusetts  and  national  codes  not  contained  in  this 

document.

Содержание JADE32IN-B

Страница 1: ...ed installer service agency or the gas supplier WARNING FIRE OR EXPLOSION HAZARD Failure to follow safety warnings exactly could result in serious injury death or property damage Models JADE32IN B JAD...

Страница 2: ...oved Pipe 21 E Use of Elbows 22 F Use of Flex Vent SLP FLEX Series 6 5 8 Inch 24 G Vent Diagrams 25 5 Vent Clearances and Vent Framing A Vent Clearances to Combustibles 37 B Wall Penetration Framing F...

Страница 3: ...ed ___________________________ Gas Section 9 Pg 54 57 Proper appliance for fuel type ___________________________ Was a conversion performed ___________________________ Leak check performed and inlet p...

Страница 4: ...cial and or local authorities having jurisdiction for installations at elevations above 4500 feet 1370 m Check with your local gas utility to determine proper orifice size B Glass Specifications Heart...

Страница 5: ...or plastered or unplastered shall be considered combustible materials G Electrical Codes NOTICE This appliance must be electrically wired and grounded in accordance with local codes or in the absence...

Страница 6: ...vented gas fu eled heating appliance or equipment The sign shall read in print size no less than one half 1 2 in in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OB STRUCTIONS Inspection The state or...

Страница 7: ...ury or property damage For assistance or additional information consult a qualified service technician service agency or your dealer Figure 2 1 Good Faith Wall Surface Temperatures Above Appliance B G...

Страница 8: ...Electric Shock DO NOT use this appliance if any part has been under water Call a qualified service technician to inspect the appliance and to replace any part of the control system and or gas control...

Страница 9: ...Appliance Dimensions JADE32IN B Location Inches Millimeters M 16 3 4 425 N 6 5 8 168 O 34 3 8 873 P 2 3 16 56 Q 6 152 R 17 1 4 438 S 25 7 8 657 T 38 1 2 978 U 6 1 8 156 V 7 1 2 191 W 10 3 8 264 X 7 3...

Страница 10: ...1 W 10 3 8 264 X 7 3 4 197 Location Inches Millimeters A 48 1219 B 43 1092 C 39 1 16 993 D 15 1 4 387 E 33 11 16 856 F 3 1 2 89 G 7 178 H 46 1 2 1181 I 9 13 16 249 J 9 13 16 249 K 1 2 13 L 37 3 4 959...

Страница 11: ...0 D G E C B A F Barrier Mesh Integral to Decorative Barrier Front H Dimensions are actual decorative barrier front dimensions Use for reference only Figure 3 3 Decorative Barrier Front Dimensions CFTF...

Страница 12: ...ecorative barrier front must be ordered at time of fireplace purchase If decorative barrier front is not present contact dealer Note See Section 10 for hearth mantel and finishing requirements PFF DEC...

Страница 13: ...N PURPOSES ONLY Illustrations diagrams are not drawn to scale Actual installation may vary due to individual design preference Figure 3 5 Appliance Locations A E A C TOP VENT ONE 900 ELBOW ALCOVE INST...

Страница 14: ...p and side Drywall or combustible materials mini mum 1 2 inch thick are designed to contact the non combustible material appliance as called out in Section 10 Finishing This appliance has been thoroug...

Страница 15: ...1 8 millimeters 89 51 1219 791 JADE42IN B JADE42IL B Inches 3 1 2 2 48 48 1 2 millimeters 89 51 1219 1232 Measurement for Trim Kit 3 1 2 in Additional Finishing Material Thickness Measurement without...

Страница 16: ...ce Bottom of Appliance to Ceiling Minimum Clearance to Combustible Materials JADE32IN B JADE42IN B JADE42IL B Inches 12 1 4 8 3 4 39 82 18 millimeters 311 222 991 2083 457 Framing Dimensions Passive H...

Страница 17: ...ers 51 1219 1232 Mesh screen required for front discharge or open top discharge passive heat installations with discharge opening of 3 inches or greater Mesh screen recommended for front discharge or...

Страница 18: ...Gas line holes and other openings should be sealed with caulk with a minimum of 300 F continu ous exposure rating or stuffed with unfaced insulation If the appliance is being installed on a cement su...

Страница 19: ...r other materials Failure to keep insulation or other materials away from vent pipe could cause overheating and fire WARNING Figure 4 2 Staggered Termination Caps H minimum may vary depending on regio...

Страница 20: ...et to building or the combustion air inlet to any other appliance termination mechanical or non mechanical 9 in 229 mm 12 in 305 mm I clearance to a mechanical powered air supply inlet All mechanical...

Страница 21: ...X 6 5 8 inch and SLP FLEX7 7 inch venting systems DO NOT mix pipe fittings or joining methods from different manufacturers SLP FLEX and SLP FLEX7 venting cannot be interchanged SLP FLEX 6 5 8 Inch Ven...

Страница 22: ...pe is allowed between two 45 elbows See Figure 4 5 Figure 4 6 shows the vertical and horizontal offsets for SLP elbows Figure 4 5 HORIZONTAL VERTICAL RUN RISE E F F E C T I V E L E N G T H Y X X X Ven...

Страница 23: ...re shown using the effective length of pipe See Section 12 A Figure 12 1 for information on effective length of pipe components Horizontal terminations are measured to the outside mounting surface fla...

Страница 24: ...A support is required at each change in venting direc tion and in any location where it is necessary to maintain the necessary clearance to combustibles A simple up and out installation Figure 4 10 re...

Страница 25: ...be installed horizontally See Figure 4 15 Elbows may be placed back to back anywhere in the system Any 90 elbow may be replaced with two back to back 45 elbows When penetrating a combustible wall a wa...

Страница 26: ...tion See Figure 4 10 H1 V1 V Minimum H1 Maximum JADE42IN B JADE42IL B JADE32IN B 90 Elbow Not Allowed 1 ft 305 mm 1 ft 305 mm 1 ft 305 mm 2 ft 610 mm 2 ft 610 mm 3 ft 914 mm 4 ft 1 2 m 3 ft 914 mm 5 f...

Страница 27: ...mm 1 ft 305 mm 2 ft 610 mm 2 ft 610 mm 2 ft 610 mm 4 ft 1 2 m 3 ft 914 mm 4 ft 1 2 m 6 ft 1 8 m 4 ft 1 2 m 6 ft 1 8 m 15 ft 4 6 m 5 ft 1 5 15 ft 4 6 m H1 H2 MAX 15 ft 4 6 m V1 H1 H2 MAX 40 ft 12 2 m...

Страница 28: ...eed 40 ft 12 2 m CAUTION The SLP HRC SS termination caps are not approved for use with these models May lead to elevated glass temperature that may cause tempered glass breakage JADE42IN B JADE42IL B...

Страница 29: ...1 m Risk of Fire This vent configuration can ONLY be used for JADE42IN B Natural Gas appliance WARNING CAUTION The SLP HRC SS termination caps are not approved for use with these models May lead to el...

Страница 30: ...al 2619 986 Rev B 10 19 30 Top Vent Vertical Termination No Elbow Figure 4 16 V1 60 ft Max 18 3 m Note Use SLP Series components only Note If installing a vertical vent termination off the top of the...

Страница 31: ...haust Restrictor Installation 1 JADE42IN B JAD42IL B Only Remove inner heat shield by removing two wing nuts from top front of heat shield and two screws that secure the heat shield to back wall of fi...

Страница 32: ...t 4 6 m V1 V2 H MAX 40 ft 12 2 m No specific restrictions on this value EXCEPT V1 V2 H cannot exceed 40 ft 12 2 m JADE42IN B JADE42IL B V1 Minimum H Maximum V2 V1 V2 Minimum 1 ft 305 mm 2 ft 610 mm 2...

Страница 33: ...X 14 ft 4 3 m V1 V2 H1 H2 MAX 40 ft 12 2 m No specific restrictions on this value EXCEPT V1 V2 H1 H2 cannot exceed 40 ft 12 2 m JADE42IN B JADE42IL B V1 Minimum H1 H2 Maximum V2 V1 V2 Minimum 1 ft 305...

Страница 34: ...MAX V2 MIN H2 MAX V3 MIN 2 1 2 ft 762 mm 4 ft 1 2 m 4 ft 1 2 m 4 ft 1 2 m 3 1 2 ft 1 0 m V1 V2 V3 H1 H2 Maximum 40 ft 12 2 m V1 H1 V2 V3 H2 Figure 4 20 Four 90 Elbows Top Vent Vertical Termination co...

Страница 35: ...a minimum of a NFPA 211 Level 2 inspection of the chimney Replace component parts of the chimney and fireplace as specified by the professionals Ensure all joints are properly engaged and the chimney...

Страница 36: ...apping screws Attach one section of flexible vent pipe to the inlet collar on top of the DV 46DVA GCL adapter with three self tapping screws To minimize cold air drafts seal around the flex vents at t...

Страница 37: ...arance bottom sides Heat Shield Wall Shield Firestop Heat Shield WALL 3 in 76 mm top clearance 1 in 25 mm clearance around vertical sections B Wall Penetration Framing Firestops Combustible Wall Penet...

Страница 38: ...g Firestop Floor Penetra tion Framing WARNING Risk of Fire DO NOT pack insu lation around the vent Maintain clearances to vent to prevent overheating A ceiling firestop MUST be used between floors and...

Страница 39: ...screws and discard See Figure 6 1 2 Fold up top heat shield to 90 degrees as shown in Figure 6 2 REMOVE SCREWS Figure 6 1 JADE42IN B JADE42IL B Shipping Position Figure 6 2 JADE42IN B JADE42IL B Top H...

Страница 40: ...eps Heat Management System options are HEAT ZONE GAS The heat is diverted into an adjacent room HEAT OUT GAS The heat is diverted outside the home building Smart Wall TV Kit The warm air from the appl...

Страница 41: ...r nailing tab Optional Secure the appliance to the floor by inserting two screws through the pilot holes at the bottom of the appliance Risk of Fire Prevent contact with Sagging or loose insulation In...

Страница 42: ...ustible components from the shipping position and set aside 2 Remove the lower cover panel by removing two screws located on the lower left and right sides of the appliance opening Retain screws Lift...

Страница 43: ...below including the slip section that connects directly to the horizontal termination cap Apply a bead of silicone sealant 300 F minimum con tinuous exposure rating inside the female outer pipe joint...

Страница 44: ...p section See Figure 7 4 120 Figure 7 5 Securing Vertical Pipe Sections C Secure the Vent Sections WARNING Risk of Fire Explosion or Asphyxiation Improper support could allow vent to sag and separate...

Страница 45: ...B 10 19 D Disassemble Vent Sections Rotate either section see Figure 7 7 so the seams on both pipe sections are aligned as shown in Figure 7 8 Pull carefully to separate the pieces of pipe Figure 7 8...

Страница 46: ...ove the roof SEAL Figure 7 9 Assemble and Install Storm Collar CAUTION Risk of Cuts Abrasions or Flying Debris Wear protective gloves and safety glasses during instal lation Sheet metal edges are shar...

Страница 47: ...xisting heat shields using the screws supplied with the extended heat shield Refer to vent components diagrams in the back of this manual Rest the small leg on the extended heat shield on top of the p...

Страница 48: ...rcuits to mitigate the interference potential If interference is occurring on the same circuit the use of surge protectors may help alleviate the interference 8 Electrical Information Valve Control Ac...

Страница 49: ...erates on a 6 volt 1 5AMP system Plug the 6 volt transformer plug into the appliance junction box to supply power to the unit OR install 4 AA cell batteries not included into the battery pack before u...

Страница 50: ...NGE INTERMITTENT PILOT IGNITER NG 2106 169 HOT NEUTRAL JUNCTION BOX 110 120 VAC I S IFT CONTROL MODULE 2326 130 VALVE NG 2166 302 BLK BLACK RED GREEN ORANGE BRN RED RED WHITE WIRE ASSEMBLY 2118 170 WI...

Страница 51: ...ROL BRN BLK OPTIONS FAN GFK 160A IFT RC150 WIRELESS WALL SWITCH IFT RC400 REMOTE CONTROL IFT AUX AC MODULE CABLE 2326 152 RF MODULE 2326 120 RF MODULE 2326 120 2326 150 LED s GREEN MAIN WIRE HARNESS N...

Страница 52: ...PILOT IGNITOR 2106 169 HOT NEUTRAL JUNCTION BOX 110 120 VAC I S IFT CONTROL MODULE 2326 130 VALVE NG 2166 302 BLK GREEN ORANGE BRN WIRE HARNESS 2326 132 AC MODULE CABLE 2326 152 RF MODULE 2326 120 IF...

Страница 53: ...he switch box connect the black hot wire and red switch leg wire to the wall switch as shown At the appliance connect the black hot white neutral and green ground wires to the junction box as shown Ad...

Страница 54: ...mmonwealth of Massachusetts ap proved 1 2 in 13 mm T handle manual shut off valve and flexible gas connector are connected to the 1 2 in 13 mm control valve inlet If substituting for these components...

Страница 55: ...or compliance 2 Remove the two screws that secure the pilot shield to the burner bracket and remove the two screws that secure the pilot assembly to the burner bracket Remove the one screw that secure...

Страница 56: ...Please consult provincial and or local authorities having jurisdiction for installations at elevations above 4500 feet 1370 m Check with your local gas utility to determine proper orifice size Figure...

Страница 57: ...w 9 inches of horizontal vent pipe Adjust air shutter for different vent runs See Figure 9 5 Loosen the 1 4 inch screw Twist the air shutter to adjust Air shutter may be opened for longer horizontal v...

Страница 58: ...those consisting entirely of steel iron brick tile concrete slate glass or plasters or any combination thereof Materials that are reported as passing ASTM E 136 Standard Test Method for Behavior of M...

Страница 59: ...ace opening Ensure that the 1 8 inch gap is maintained between the factory installed non combustible board and the surrounding drywall See Figure 10 1 Secure the drywall to the framing with screws a m...

Страница 60: ...irements Do not drill or install screws which may penetrate the lower cover panel as this will restrict required access to the glass battery backup and control module See Figure 10 2 Note If the desir...

Страница 61: ...m clear ances as specified Framing closer than the minimums list ed must be constructed entirely of non combustible materi als i e steel studs concrete board etc Note Measurement is taken from top of...

Страница 62: ...KED CEILING CEILING DO NOT INSTALL FINISHING MATERIAL ON THIS SURFACE 2 IN MIN OPENING MUST NOT BE BLOCKED CEILING 12 1 4 IN 8 3 4 IN SIDE DISCHARGE DISCHARGE SLOTS ON BOTH SIDES OF APPLIANCE FRONT DI...

Страница 63: ...BUSTIBLE FINISHING MATERIAL 0 1 IN THICK CFTF DECORATIVE FRONT SHOWN DRYWALL OR EQUIVALENT 1 2 IN Both the CFTF and PFF decorative barrier fronts are de signed to overlap finish materials 0 inches to...

Страница 64: ...front See Figure 10 10 If the desired look is to include the outer decorative barrier front trim finishing materials up to 1 3 16 around the fireplace opening See Fig 10 11 For this installation the...

Страница 65: ...CFTF Front Without Outer Decorative Front Trim CFTF Decorative Front Non Combustible Finish Material 1 6 Inches Thick 0 IN 0 IN CFTF 0 IN Figure 10 14 Clearances to Appliance Opening Without Outer De...

Страница 66: ...This diagram specific to these models JADE32IN B JADE42IN B JADE42IL B 82 IN MIN FIREPLACE OPENING 2 X 4 FRAMING 2 X 4 OR 2 X 6 FRAMING CHASE CEILING 1 2 INCH WALL SHEATHING FINISHING MATERIAL REQUIR...

Страница 67: ...for use with the JADE42IN B JADE42IL B and JADE32IN B models Install the LED lights per the instructions included in the kit E Install Stones Optional An optional stones kit is available for use with...

Страница 68: ...engaged by vi sually verifying that glass latches have engaged both left and right tabs on the glass frame 4 Verify the bottom two glass latches have engaged the glass frame tabs by grasping the bott...

Страница 69: ...Barrier Front WARNING Risk of Fire Install ONLY decorative barrier fronts approved by Hearth Home Technologies Unap proved decorative barrier fronts could cause fireplace to overheat IMPORTANT This f...

Страница 70: ...SLP45 45 Elbow SLP90 90 Elbow Effective Height Length SLP PIPE SLP HVS Horizontal Pipe Support SLP FS Ceiling Firestop SLP WS Wall Shield Firestop 10 7 8 in 276 mm 8 7 8 in 225 mm 1 1 2 in 38 mm 8 11...

Страница 71: ...xisting heat shields must be field trimmed If wall thickness is greater than 7 1 4 in 184 mm a DVP HSM B will be required Heat Shield Term Cap Minimum Effective Length Maximum Effective Length Trap1 3...

Страница 72: ...nation Kit 14 in 356 mm 14 1 16 in 357 mm 7 1 2 in 192 mm 10 3 4 in 273 mm SLP CCS BK Cathedral Ceiling Support Box Black SLP DCF BK Ceiling Firestop Black SLK SNKD Snorkel Termination Cap SLP TVHW Ve...

Страница 73: ...6DVA GCL Coaxial Colinear Appliance Connector 768 380A Stainless Steel Flex Pipe COAXIAL to COLINEAR VENTING Figure 12 5 Coaxial to Colinear Vent Components SLP HHW2 Horizontal High Wind Termination C...

Страница 74: ...ote Wire harnesses required to power the PVI SLP B connect to the appliance and are ordered separately from PVI SLP B Contact your dealer to order 16 IN 406 mm 15 IN 381 mm 16 11 16 IN 424 mm 9 3 16 I...

Страница 75: ...to order Figure 12 7 PVLP SLP Vent Components PVLP HS Heat Shield 14 IN 356 mm 15 1 2 IN 394 mm 11 1 2 IN 292 mm 8 IN 203 mm 4 3 8 IN 112 mm 10 IN 254 mm 5 1 4 IN 135 mm 2 1 4 IN 57 mm 9 1 2 IN 241 m...

Страница 76: ...E42IN B and JADE42IL B models Follow the instructions supplied with the kit for installation Contact your dealer if you have questions WARNING Risk of Fire and Electric Shock Use ONLY Hearth Home Tech...

Отзывы: