![Majestic 33BDVR Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/majestic/33bdvr/33bdvr_installation-instructions-and-homeowners-manual_3935239006.webp)
6
BDVR Series Direct Vent Gas Fireplace
10003357
Noncombustible materials such as brick or tile may be
extended over the edges of the face of the fireplace.
DO NOT cover any vent or grille panels.
If a Trim Kit is going to be installed on the fireplace, the
brick or tile will have to be installed flush with the
edges of the fireplace.
Final Finishing
Gas Specifications
Max.
Min.
Input
Input
Model
Fuel
Gas Control
BTU/h
BTU/h
33BDVRRN Nat
Millivolt
15,000
10,500
33BDVRRP Prop
Millivolt
15,000
11,250
33BDVREN Nat
24V Hi/Lo
15,000
10,500
33BDVREP Prop
24V Hi/Lo
15,000
11,250
36BDVRRN Nat
Millivolt
18,000
12,600
36BDVRRP Prop
Millivolt
18,000
13,500
36BDVREN Nat
24V Hi/Lo
18,000
12,600
36BDVREP Prop
24V Hi/Lo
18,000
13,500
39BDVRRN Nat
Millivolt
22,000
15,400
39BDVRRP Prop
Millivolt
22,000
16,500
39BDVREN Nat
24V Hi/Lo
22,000
15,400
39BDVREP Prop
24V Hi/Lo
22,000
16,500
43BDVRRN Nat
Millivolt
25,000
17,500
43BDVRRP Prop
Millivolt
25,000
18,750
43BDVREN Nat
24V Hi/Lo
25,000
17,500
43BDVREP Prop
24V Hi/Lo
25,000
18,750
33BDVR / 36BDVR / 39BDVR / 43BDVR
Certified To
ANSI Z21.88-2002 / CSA 2.33-2002
Vented Gas Fireplace Heaters
1. Choose the unit location.
2. Place the unit into position and secure it to the floor
with 1
¹⁄₂
” (38mm) screws, or nails. The holes to
secure the unit to the floor are located just behind
the access door grille on the left and right side of the
unit.
3. Frame in the fireplace with a header across the top.
It is important to allow for the finished wall face when
setting the depth of the frame.
4. Attach the fireplace to the frame using the adjustable
frame drywall strips (located behind the access door
for shipping). Preset the depth to suit the facing
material of the wall. The strips are adjustable to 1/2”
(13mm), 5/8” (16mm) or 3/4” (19mm). (Fig. 4)
5. Screw through the slotted holes in the drywall strip
and into the pre-drilled holes in the fireplace side.
Measure from the face of the fireplace to the face of
the drywall strip to confirm the final depth.
Framing and Finishing
Inlet Minimum
5.5” w.c.
11.0” w.c.
Inlet Maximum
14.0” w.c.
14.0” w.c.
Manifold Pressure
3.5” w.c.
10.0” w.c.
Gas Inlet and Manifold Pressures
Natural
LP (Propane)
High Elevations
Input ratings are shown in BTU per hour and are
certified without deration for elevations up to
4,500 feet (1,370m) above sea level.
For elevations above 4,500 feet (1,370m) in USA,
installations must be in accordance with the
current ANSI Z223.1/NFPA 54 and/or local codes
having jurisdiction.
In Canada, please consult provincial and/or local
authorities having jurisdiction for installations at
elevations above 4,500 feet (1,370m).
C
A
B
Fig. 4 Nailing flanges.
FP1023
Adjustable
1/2”, 5/8” &
3/4” Spacing
Adjustable Drywall Strip
(Nailing Flange)
Screw
Drywall
Position
Depths
A
1/2” / 13mm
B
5/8” / 16mm
C
3/4” / 19mm