background image

23

BDVR Series Direct Vent Gas Fireplace

10003357

43BDVR

Refer to Figure 41
1. Remove the top louvre assembly.
2. Remove the window frame assembly.
3. Fit the rear left log (BD11) onto the rear log support.

Ensure the back of the log is flat against the rear
wall of the support.

4. Fit the front left log (BD12) onto the left support

bracket over the burner housing assembly.
Ensure the log’s bottom holes are located onto
the two studs of the bracket.

5. Place the top center log (BD13) in position by

resting the hole under the top end of this log located
over the knob on the center of the rear log, while
the bottom end of the log with cut out will rest
against the back wall of the deflector.

6. Place the front right log (BD14) in place with the

front part of the log sitting against the back wall of
the deflector. Make sure the right front end of the
log is touching against the bend back of the deflec-
tor. Also the back end of this log will be reclined
onto the rear log.

7. Scatter the ember material over the front area of the

burner housing assembly. (Fig. 41) Do not pack this
material tightly, separate it when unpacked and keep
it in a loose condition.

8. Scatter the lava rock material around the firebox base.

Do not place any of the lava rock mate-
rial on the burner housing assembly.

39BDVR

Refer to Figure 40

1. Remove the top louvre assembly.

2. Remove the window frame assembly.

3. Fit the rear left log (BC10) onto the left side of the

rear log support. Ensure the log’s bottom holes are
located on the two studs of the support.

4. Fit the rear front and right log (BC13) onto the right

side of the rear log support. Ensure the log’s bottom
holes are located on the two studs of the support
and the front end of this log will be set onto the right
side of the burner housing assembly.

5. Fit front left log (BC11) onto the left support bracket

over the burner housing assembly. Ensure the  log’s
bottom holes are located on the two studs of the
bracket.

6. Place the top right log (BC12) on top of the rear and

front right log by resting the pre-cut rectangular hole
under the end of this log located over the
rectangular knob on the rear and front right log.

7. Scatter the ember material over the front area of the

burner housing assembly. (Fig. 40) Do not pack this
material tightly, separate it when unpacked and
keep it in a loose condition.

8. Scatter the lava rock material around the firebox

base.

BC10

BC13

BC11

Embers

BC12

LG269

39BDVR

Fig. 40  39BDVR log placement.

Do not place any of the lava rock material
on the burner housing.

BD13

BD11

BD12

Embers

BD14

43BDVR

LG270

Fig. 41  43BDVR log placement.

Содержание 33BDVR

Страница 1: ...r from your neighbor s phone Follow the gas suppliers instructions If you cannot reach your gas supplier call the fire department WARNING IF THE INFORMATION IN THIS MANUAL IS NOT FOLLOWED EXACTLY A FI...

Страница 2: ...Location 7 EB 1 Electrical Box 8 Electronic Gas Control Valve 8 General Venting Information General Venting Information Termination Location 10 General Information Assembling Vent Pipes 11 How to Use...

Страница 3: ...installed on a metal or wood panel extending the full width and depth of the fireplace 12 This fireplace requires adequate ventilation and combustion air to operate properly 13 This fireplace must no...

Страница 4: ...5 140mm K 7 191mm 10 254mm 8 213mm 8 210mm L 8 216mm 13 343mm 12 318mm 12 318mm M 1 18mm 1 18mm 1 18mm 1 18mm Framing Dimensions N 29 737mm 35 889mm 35 889mm 37 959mm O 33 851mm 36 927mm 39 1003mm 43...

Страница 5: ...and the following Mantel Charts The fitting of a bay window trim kit does not effect the distances and reference points referred to in the diagram and chart Noncombustible mantels and legs may be ins...

Страница 6: ...he floor are located just behind the access door grille on the left and right side of the unit 3 Frame in the fireplace with a header across the top It is important to allow for the finished wall face...

Страница 7: ...to the 120 volt power supply Alternate Switch Location The remote switch can be installed on the front side of the access door Simply mount the switch to the bracket provided and screw the bracket to...

Страница 8: ...ect the ground wire of the supply line to the green screw of the socket assembly 8 Refit the socket assembly back into the electrical box and replace the cover plate Secure the cable with the clamp on...

Страница 9: ...gs within 24 610mm from the front of the termination hood General Venting Do not locate termination hood where excessive snow or ice build up may occur Be sure to check vent termination area after sno...

Страница 10: ...assembly 5m above the meter regulator assy I Clearance to service regulator vent outlet 3 91cm 3 91cm J Clearance to nonmechanical air supply inlet 6 15cm for appliances 10 000 6 15cm for appliances t...

Страница 11: ...bustible 2 50mm B Combustible 6 152mm Noncombustible 2 50mm A Balcony with no side wall G Combustible Noncombustible 12 305mm G Balcony with perpendicular side wall H 24 610mm J 20 508mm H J B Recesse...

Страница 12: ...vented directly to a termination located on the rear wall behind the appliance Only CFM Corporation venting components are approved to be used in these applications Refer to Venting Components listed...

Страница 13: ...ing for Combustible Wall 9 240mm 10 264mm Fireplace Hearth Framing Detail Opening for Noncombustible Wall 7 190mm VO584 100 Fig 14 Locate vent opening on wall Max Length 12 305mm 8 Screws 2 8 Screws 2...

Страница 14: ...efers to the total length of vent pipe from the flue collar of the fireplace to the face of the outer wall Horizontal plane means no vertical rise exists on this portion of the vent assembly The maxim...

Страница 15: ...ming off the transition elbow Canadian USA Installations The venting system must conform with local codes or in the absence of local codes with National Fuel Gas Code ANSI Z223 1 NFPA 54 latest editio...

Страница 16: ...lace with three 3 screws Fig 24 Follow with the installation of the inner and outer elbow Again secure joints with three 3 sheet metal screws Wipe off any excess high temperature sealant STEP 4 Measur...

Страница 17: ...e wall 5 Apply high temperature sealant caulking supplied around the 4 and 7 snorkel collars 6 Slide into the vent pipe and secure to the wall 7 Level the soil to maintain a 4 102mm clearance below sn...

Страница 18: ...maximum of three 90 elbows Vertical Through the Roof Applications If the foundation is recessed use recess brackets not supplied for securing lower portion of the snorkel Fasten brackets to wall first...

Страница 19: ...tion always face downward Fig 33 11 11 Joist Joist Firestop Spacer Nails 4 Upper Floor Attic Insulation Shield Ceiling Installation CFM100 Fig 32 Place firestop spacer s and secure 40 12m Storm Collar...

Страница 20: ...TDVSNORK for Below Grade Installation 45 Elbow 7TDV45 for Rear Vent to Vertical Vent or Vertical Horizontal Offsets 90 Transition Elbow 7TDVRT90 for Rear Vent to Vertical Vent 90 Elbow 7TDV90 Vertical...

Страница 21: ...e Also initial paint curing may deposit a slight film on the glass It is therefore recommended the glass be cleaned two or three times with a non ammonia based household cleaner and warm water We reco...

Страница 22: ...the front end of this log will also set against the back wall of the deflector 6 Scatter the ember material over the front area of the burner housing assembly Fig 38 Do not pack this material tightly...

Страница 23: ...firebox base Do not place any of the lava rock mate rial on the burner housing assembly 39BDVR Refer to Figure 40 1 Remove the top louvre assembly 2 Remove the window frame assembly 3 Fit the rear lef...

Страница 24: ...Flame Characteristics Flame Temperature Adjustment L O HI Turn counterclockwise to decrease flame height Turn clockwise to increase flame height Fig 42 Flame adjustment knob for Honeywell valve Honey...

Страница 25: ...ally When lighting the pilot follow these instructions exactly B BEFORE LIGHTING smell all around the heater area for gas Be sure to smell next to the floor because some gas is heavier than air and wi...

Страница 26: ...n by hand do not try to repair it call a qualified service technician Force or attempting repair may result in a fire or explosion D Do not use this appliance if any part has been under water Immediat...

Страница 27: ...All Wiring Connections Replace Piezo Ignitor Supply Line Hooked Up Shutoff Valve Open Pilot Stays Lit For Air In The Lines Thermopile Needs A Min 325mv Adjust Pilot Flame Height All Wiring Connection...

Страница 28: ...er wire across terminals at wall switch if burner comes on replace defective wall switch If okay jumper wires across wall switch wires at valve if burner comes on wires are faulty or connections are b...

Страница 29: ...ES ARE GOOD AND PILOT BURNER ORIFICE IS NOT BLOCKED CHECK ELECTRICAL CONNECTIONS BETWEEN MODULE AND PILOT OPERATOR ON GAS CONTROL CHECK FOR 24VAC ACROSS PV MVPV TERMINALS ON MODULE IF VOLTAGE IS OKAY...

Страница 30: ...B and diaphram C b Ensure the rubber gasket D is properly posi tioned and install the new HI LO pressure regula tor to the valve using the new screws E supplied with the kit Tighten screws securely Re...

Страница 31: ...rmopile millivolt gas valve Most of these components may require only an occasional checkup and cleaning and some may require adjustment If repair is necessary it should be performed by a qualified te...

Страница 32: ...b 16 11 20 24 15 8 7 5 3a b 4a b 19 21 22 23 6 10 25 9 26 1f 1h 1b 33BDVR 1c 1a 1b 36BDVR 1f 1a 1e 1g 39BDVR CFM Specialty Home Products reserves the right to make changes in design materials specifi...

Страница 33: ...T Top Convertible NG 10002268 10002268 10002268 10002268 Pilot orifice SIT Top Convertible Prop 10002269 10002269 10002269 10002269 6 Pilot hood SIT Top Convertible 10002385 10002385 10002385 10002385...

Страница 34: ...481 55686 57437 57438 Gasket window glass 57317 57317 57317 57317 20 Clamp window frame assembly 54174 54174 54174 54174 21 Window trim polished brass w magnets 55005 57480 57483 57485 22 Top louvre a...

Страница 35: ...the unit to a conveniently located wall socket Method B Using EB 1 Receptacle Box The EB 1 receptacle box Pt ZA1200 may be hard wired into the house supply The fan lead is then plugged into the EB 1...

Страница 36: ...al rewiring of this fan must be done by a licensed electrician Wiring Instructions Black White Ground Speed Control Temperature Sensor Fan FP1025 Fig 52 FK24 fan wiring Take care when handling the ref...

Страница 37: ...instructions supplied with the kit 5 Place the 2 pieces of ceramic refractory along the base of the bay window 6 Hang the Bay Window Assembly over the existing window frame assembly 7 Reinstall the up...

Страница 38: ...upon inspection the damage is found to be the fault of the manufacturer repairs will be authorized at no charge to the customer parts and or labor Any part and or component replaced under the provisi...

Страница 39: ...39 BDVR Series Direct Vent Gas Fireplace 10003357...

Страница 40: ...9 76 79 58 36BDVRRP 48 9 77 80 58 36BDVREN 48 9 76 79 58 36BDVREP 48 9 77 80 58 39BDVRRN 56 5 77 79 63 39BDVRRP 56 5 78 80 63 39BDVREN 56 5 77 79 63 39BDVREP 56 5 78 79 63 43BDVRRN 52 9 76 77 63 43BD...

Отзывы: