7
majacraft
7. Pulley
Required:
1 - Pulley
1 - 2mm Allen key
(in the hardware bag)
When you slide the pulley on the flyer shaft, it is important that the
grub screw is lined up above the flat that has been ground on the
The spinning head can be raised or lowered to suit the tensioning of the drive belt and the height at
which you wish to spin.
Screw the JCB bolt into place without
tightening it fully. Position the head near
the top of the handle and then tighten
the JCB bolt firmly. There is no need to
over-tighten this.
6b
6c
6d
6e
7b
7a
7c
flyer shaft. When the
pulley is correctly
aligned, use the allen
key to tighten the
grub screw.