OPERATION MANUAL
4
iv. Do not come into contact with the output terminals while the machine is in operation. An electric shock
may possibly occur.
ATTENTION! - CHECK FOR GAS LEAKAGE
At initial set up and at regular intervals we recommend to check for gas leakage
Recommended procedure is as follows:
1. Connect the regulator and gas hose assembly and tighten all connectors and clamps.
2. Slowly open the cylinder valve.
3. Set the flow rate on the regulator to approximately 8-10 L/min.
4. Close the cylinder valve and pay attention to the needle indicator of the contents pressure gauge on the
regulator, if the needle drops away towards
zero there is a gas leak. Sometimes a gas leak can be slow and to identify it will require leaving the gas
pressure in the regulator and line for an
extended time period. In this situation it is recommended to open the cylinder valve, set the flow rate to 8-10
L/min, close the cylinder valve and check
after a minimum of 15 minutes.
5. If there is a gas loss then check all connectors and clamps for leakage by brushing or spraying with soapy
water, bubbles will appear at the leakage
point.
6. Tighten clamps or fittings to eliminate gas leakage.
IMPORTANT! - We strongly recommend that you check for gas leakage prior to operation of your machine.
We recommend that you close the cylinder valve when the machine is not in use.
Содержание MIG200L PRO DUAL PULSE
Страница 1: ...OPERATION MANUAL MIG200L PRO DUAL PULSE ...
Страница 29: ...MIG 200L DUAL PULSE 27 CIRCUIT ...