Follow the instructions and press Enter.
Filling phase in process
g XXXX
The data is displayed during filling phase.
Filling phase finished
g XXXXX
Process finished
Press ENTER to confirm.
If memory card is present in the device, system diagnostics phase may follow the
refrigerant feeding phase. The system shows the following message:
System diagnostics? Yes
No
Select Yes to start system diagnostics phase. See Chapter Błąd! Nie można odnaleźć
źródła odwołania.
Diagnostics.
NB.
It is suggested that a diagnosis of the installation is performed even without the
expansion card. Close HP and LP valves. Start the motor and keep the rotational speed at
1 500/2000 r.p.m. Start the A/C system and set the maximum fan speed and minimum
temperature. Wait for the A/C/system to stabilize. Check pressures on the pressure gauges
and the temperature in the main air exit. Start motor and the A/C/system.
If the pressure in the
internal
cylinder
is
not
sufficient to perform filling,
the procedure of stating the
remaining amount should be
performed
through
the
„suction” port of the A/C
system. Cf. Section 7.