4.2: Mounting
Centers
4.2.(a):
Standard centers for hanger installation are 5’0” on horizontal and vertical systems.
4.3:
Single Mounting Hanger (FS-SH)
4.3.(a):
Remove nut, lock washer and flat washer from hanger base mounting bolt.
4.3.(b):
Assemble hanger base to mounting bracket by inserting hanger bolt through mounting bracket hole
(
NOTE: Minimum spacing of 1.75”
).
4.3.(c):
Assemble washer, lock washer and bolt to hanger base bolt and hand tighten.
4.3.(d):
Snap line elements into the snap-in-hangers.
4.3.(e):
Verify the alignment of the systems and tighten the nuts 15 ft-lb. (180 in-lb.).
NOTE: Tools Required: ½” Wrench or Socket
4.4:
Single Mounting Hanger (FS-HST)
4.4.(a):
Remove nut, lock washer, flat washer(s), and spacer from hanger base mounting bolt.
4.4.(b):
Assemble hanger base to mounting bracket by inserting hanger bolt through mounting bracket hole
and spacer (
NOTE: Minimum spacing of 1.75”
).
4.4.(c):
Assemble washers, lock washer and bolt to hanger base bolt and hand tighten.
4.4.(d):
Snap line elements into the snap-in-hangers.
4.4.(e):
Tighten the anchor hanger clamping nuts 8 ft-lb (48 in-lb.). Do not over-tighten.
4.4.(f):
Verify the alignment of the systems and tighten the nuts 15 ft-lb. (180 in-lb.).
4.4.(g):
Verify the line element is free to move along the length of the runway, and that the hanger is
secured to the insulation cover.
NOTE: Tools Required: ½” Wrench or Socket and 7/16” Wrench