9
8
6
UV reflection sensors
7
Magnetic sensors
5
6
4
7
Figure 7
8
Counting sensors
9
Pocket switch
8
9
Figure 6
Preparing for Operation
1
Make sure that the safety precautions mentioned in the relevant section of
the manual are kept.
2
Install the banknote guide (
Figure 1, item 2
) included in the delivery set:
2.1
Take one banknote guide (
Figure 1, item 2
) and match the tabs of the
guide (
see Figure 8
) with the slots of the banknote guide holder (
see
Figure 9
).
2.2
Push the guide into the holder (
see Figure 10
).
2.3
To fasten the guide on the holder, move it down up to the stop (
see
Figure 11
).
Repeat points
for the second banknote guide.
2.4
2.1-2.3
2.5
T o check that the banknote guides are installed properly, move the
guides manually aside, to the maximum and minimum; the
movement shall be synchronous and without jerks.
To remove the guide (for example, before transportation), take the upper
part of the guide, press it slightly and then pull it up.
Figure 8
Clamps
Tabs
Figure 9
Banknote
guide holder
Banknote
guide holder
Slots
Figure 10
Figure 11
3.
Connect the counter to electric outlet by power cord.
Operation
1
Make sure that the safety precautions mentioned in the relevant section of
the manual are kept.
2
Use a power switch (
Figure 2, item 12
) to switch the counter on. After you
have done it, a process of the firmware loading and self-testing is activated
and an image (
see Figure 12
) appears on the graphical display (
Figure 3,
item 2
). During self-test the loading indicator is moving, the stacker wheels
(
Figure 1, item 8
) and the hopper rollers (
Figure 1, item 3
) are rotating.
SW version
Loading
indicator
Figure 12
After self-testing is over, you hear an audio signal, and the display shows
the following picture (
see Figure 13
):
Currency
database version
MAGNER PRB VALUE COUNTER
MAGNER PRB VALUE COUNTER