6. CONNECTIONS
TO BE MADE
BY THE USER
Operations that must be carried out by
qualified personnel in compliance with the
laws in force.
Water and gas supply
Connections must be installed close to the
machine.
Water drainage pipe, having a minimum internal
diameter of 30 mm, equipped with a water-trap
accessible for inspection. 3
Water supply pipe, whith a 3/8”G cut-off tap. 4
Gas supply pipe with a cutoff tap. 2
The machine with gas heating must be
installed in compliance with current local
laws.
Electric supply
The machine is delivered ready for connection
according to the electrical specif ications
requested.
Before connecting the machine, ensure that the data on the label corresponds to that of the electrical supply
network.
The cable must be connected to the connections previously prepared in compliance with the laws in force.
Ensure that the earth connection is efficient and corresponds to current laws.
The earth leakage protection circuit breaker must be installed in compliance with the law.
For the power supply, use a regulation cable with a ground wire.
For three-phase power supply, use a 5 wire cable (3 N ground).
The mains supply should include an automatic power switch 1 complete with magnetic breakers demensioned
according to the data on the machine identification label.
The contacts must have an opening equal or superior to 3 mm.
The machine itself must be earthed.
The manufacturer declines any responsibility in cases where these accident prevention measures have
not been respected.
7. POSITIONING
Place the machine on the horizontal surface previously prepared.
Before connecting, thoroughly wash the mains water pipes:
Leave the water supply taps running at full pressure for several minutes.
Connect to the mains water supply.
Connect the machine to the socket.
Connect the gas pipe.
Thoroughly wash all the water pipes of the machine:
Leave the water supply taps running at full pressure.
8
Fig. 1