CHAPTER 2 - INSTALLATION
2-1 ASSEMBLING NOTES
This chapter contains all the directions re-
quired to properly assemble the machine.
Before assembling the squaring machine, it is
advisable to choose a suitable place for the
installation, making allowance for the overall
dimensions of the equipment (see figure at
paragraph 1-9).
For safety distances refer to paragraph 2-2.
Place the machine in a closed room, in a
position suitable for work and for easy connec-
tion to the mains.
The area where the machine will be located
must be lit enough for both work and mainte-
nance activities.
Do not use bolts, nuts and screws other
than those indicated. Carefully follow the
assembling procedure described in the fol-
lowing chapters. Improper machine assem-
bly can result in extremely dangerous situ-
ations.
2-2
SPARE CLEARANCES AROUND
THE MACHINE
If the machine is to be properly used and easily
maintained under safe conditions, the area
around the installation site should be kept clear
as shown in the figure 4.
2-3 SETTING UP THE BENCH
Fasten the four legs to the bench as shown in
the figure. Use three screws (1), three nuts (2)
and six washers (3) for each leg.
The next step consists in making the machine
level.
WARNING
Fig.4
Fig.5
Use a spring level and turn screws (4) until the
machine is level. Tighten lock nuts (5), figure 5.
To ensure maximum safety and efficiency of
the machine, the floor is to be made of well-
levelled concrete. If the floor does not meet
such requirement, a concrete slab will have to
be prepared.
N.B.: Dimensions in mm
Содержание BEST 1250
Страница 1: ...Cod 00008254 REV 0 01 10 04 048943 JUNIOR 640 BIG 800 BEST 960 BEST 1250...
Страница 29: ...28 NOTES...
Страница 30: ...29 D JUNIOR 640 BIG 800 BEST 960 BEST 1250 RADIALS GEN e n g i n e e r i n g RADIALS GEN...
Страница 55: ...54 ANMERKUNG...
Страница 81: ...80 OPMERKINGEN...
Страница 107: ...106 BEM RKNINGER...
Страница 133: ...132 HUOMAUTUKSIA...
Страница 142: ...141 TAB 1 BENCH GROUP ABB 1 EINHEIT ARBEITSPLATTE AFB 1 BANKEENHEID TAV 1 BORD ENHED KUVAL 1 TY TASORYHM...
Страница 146: ...145 TAB 2 PILLAR GROUP ABB 2 EINHEIT S ULE AFB 2 ZUILEENHEID TAV 2 S JLE ENHED KUVAL 2 TOLPPARYHM...
Страница 150: ...149 TAB 3 ARM GROUP ABB 3 EINHEIT ARM AFB 3 ARMEENHEID TAV 3 ARM ENHED KUVAL 3 VARSIRYHM...
Страница 154: ...153 TAB 3 ARM GROUP ABB 3 EINHEIT ARM AFB 3 ARMEENHEID TAV 3 ARM ENHED KUVAL 3 VARSIRYHM...
Страница 158: ...157 TAB 4 FORK GROUP ABB 4 EINHEIT GABEL AFB 4 VORKEENHEID TAV 4 GAFFEL ENHED KUVAL 4 HAARUKKARYHM...
Страница 162: ...161 TAB 4 FORK GROUP ABB 4 EINHEIT GABEL AFB 4 VORKEENHEID TAV 4 GAFFEL ENHED KUVAL 4 HAARUKKARYHM...
Страница 166: ...165 TAB 5 MOTOR GROUP ABB 5 EINHEIT MOTOR AFB 5 EENHEID MOTOR TAV 5 MOTOR ENHED KUVAL 5 MOOTTORIRYHM...
Страница 170: ...169 TAB 5 MOTOR GROUP ABB 5 EINHEIT MOTOR AFB 5 EENHEID MOTOR TAV 5 MOTOR ENHED KUVAL 5 MOOTTORIRYHM...
Страница 179: ...178 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze Via delle regioni 299 50052 CERTALDO Firenze...
Страница 181: ...180 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze Via delle regioni 299 50052 CERTALDO Firenze...
Страница 183: ...182 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze Via delle regioni 299 50052 CERTALDO Firenze...
Страница 185: ...184...