ZSX Ec
16
02/2022
21.
Close the guard sheet (16) at the bottom of
the guide bar.
22.
Using the combination screwdriver (B), turn
the hexagon socket screw (15)
clockwise
to
tighten it.
Fig. 11: Closing the guard sheet at the guide bar
23.
Insert the cover and close it.
Fig. 12: Inserting the cover
24.
Insert the fillister head screw (10). Using the
combination screwdriver (B), turn it
clockwise
to tighten it.
25.
Close the spring-loaded lower protection flap
(11) upward.
✓
The saw chain is changed.
Fig. 13: Closing the protective flap
A new saw chain must be run in at idle speed for approx. 2 to 3 minutes after it has been
mounted. Ensure that there is sufficient chain lubrication during this process. After this
initial run-in, it may be necessary to correct the chain tension.