INSTALLATION
- FLEXIBLE WALL
10
02/18
4. 1ª side plasterboard installation
1. Plasterboard 15mm
2. Steel metal screws (3,5 x 25mm)
DESCRIPTION
Fix the first side of plasterboards on one side of the structure and trim the perimeter describer by the damper support
structure.
1
1
1
2
L1
H1
5. Isolation installation
1. MINERAL W OOL(40mm, 50Kg/m
3
)
DESCRIPTION
Fill the gap between the metal structure with mineral wool.
1