background image

first hub's uplink jack. Next, the other end of the cable should be plugged in the
other hub's regular jack. 

To uplink the hub, users should pay attention to the following requirements:

- The cable used to uplink both hubs must be a UTP-5, UTP-1 or any equiva-

lent cable.

- The maximum length of the uplink cable must not exceed five meters. 

The hub can now be connected to the power cord.

Checking Port Status

Once the hub is connected to the power cord, the power indicator will shine

steadily. 

The hub will then automatically test each port connection. The end node must

be turned on for the test to succeed. If the end node is not turned on, the port will
indicate a connection failure. 

All ports connected to an end node should show a lighted link/activity indicator. 

If the test fails and the end node is turned on, the cable connection should be

checked, then the power connection should be verified too. If both are correctly set
up and there are still problems, we recommend contacting your dealer.

If a port, indicator, or any other part of the hub fails to work as described earlier,

the dealer should be contacted.

Installing a Dual-Speed Hub

19

Содержание FDH-608/616

Страница 1: ...1 User s Manual Dynamic Dual Speed Hub FDH 608 616 R acsense...

Страница 2: ...rds 7 Cables Required 7 Chapter 4 How to Configure a Fast Ethernet Network 9 Cable Length 9 Uplinking 9 Different Network Topologies 10 Other Ways to Expand a Network 11 Chapter 5 How to Install a Hub...

Страница 3: ...in a routing table The information on this routing table helps to identify the traffic and directs fast 100BASE TX or slow 10BASE traffic to the proper repeater buses By separating the two repeater bu...

Страница 4: ...e RJ 45 ports using Category 5 UTP UTP 5 Category 1 STP STP 1 for 100BASE TX or Category 3 4 5 UTP UTP 3 4 5 Category 1 STP STP 1 or equiva lent cables for 10BASE T We recommend starting from the high...

Страница 5: ...er Switch Repeater hub Individual port status LEDs for LINK RX 10 100 PAR and 10 100 Collision status LEDs General Features of FDH 616 16 Port Dual Speed Stackable Hub Compliant with the IEEE802 3 10M...

Страница 6: ...EIA designation Each jack serves to connect a cable to the network device The jack label 1X is designated as an uplink jack Uplink jacks are designed for connections to other network devices 4 8 3 7...

Страница 7: ...hat s more these stackable hubs break Fast Ethernet s two hub cascade barrier allowing you to link up to three hubs via the built in stack ports using any combination of these hub models These Dual Sp...

Страница 8: ...ions occur when two or more nodes accidentally attempt to transmit data across the network at the same time This happens more often with increased traf fic Naturally when you have more packets traveli...

Страница 9: ...lisioned nodes to prevent further disruption of the network Showing whether each network node is currently connected and idle trans mitting data or in 10BASE T 100BASE TX mode However according to the...

Страница 10: ...and Fast Ethernet Standards Standards for Ethernet and Fast Ethernet systems are issued by the Institute of Electrical and Electronic Engineers IEEE The standard for Ethernet twisted pair networks is...

Страница 11: ...ed pair UTP 3 4 5 or Category 1 shielded twisted pair STP 1 or any equivalent cable to transmit data 100BASE TX requires Category 5 unshielded twisted pair UTP 5 or Category 1 shielded twisted pair ST...

Страница 12: ...ion to each cable ensuring that no cable exceeds the length limit and that this length is well managed between end nodes and the hub Uplinking Uplinking a hub with another network expansion device suc...

Страница 13: ...ne device or it can used in a multiple device environment Standalone device When just one hub is being used in a network the hub is said to be a stand alone hub The hub can only be connected to users...

Страница 14: ...users may want to expand further improve network capabilities or integrate other networks Here is a brief introduction to the different ways of optimizing a network Dual Speed hubs Dual speed devices...

Страница 15: ...utomatically adjust itself to the power available Humidity The hub and indeed the entire network should be located in the driest area possible Humid places should be avoided as humidity can damage the...

Страница 16: ...led near a power outlet preferably one located in a position that is central to all network end nodes Hardware The availability of all connectors and cables required to install the hub and network sho...

Страница 17: ...nnections Use UTP 5 or STP 1 cables for 100BASE TX connections 2 Connect UTP Cable to the uplink port of the Hub then to a regular port on the Dual Speed Stackable Hub FDH 608 or FDH 616 The figure be...

Страница 18: ...an easily meet the networking needs of most small to medium sized workgroups As your workgroups gradually expand just add more hubs to your stack or cascade to another hub or switch using ordinary str...

Страница 19: ...st Ethernet Hub this protective cover cannot close properly Therefore this cover is designed with a brake away part to provide space for the MII cable to pass through 1 Locate the MII Port on the righ...

Страница 20: ...ng plugged into the end node s adapter it should be plugged into the hub s selected jack The following cable requirements should be remembered before proceeding with connections Cables must be of a UT...

Страница 21: ...ll shine steadily The hub will then automatically test each port connection The end node must be turned on for the test to succeed If the end node is not turned on the port will indicate a connection...

Страница 22: ...never the hub is connected to the wall adapter If the green light fails to shine steadily contact your dealer 10M COL indicator For FDH 608 FDH 616 Color Yellow Label Collision 100M COL indicator For...

Страница 23: ...dicator For FDH 608 Color Green Label Link One link LED is displayed for each port on the hub This indicator shows whenever the hub is receiving information When data is reaching the hub this indicato...

Страница 24: ...ed to see if it is defective Length limits Remember that the length limit for a connection between an end node and a hub cannot exceed 100 meters Cable being used for the connection Straight through c...

Страница 25: ...sure that all cables from node to node do not exceed the recom mended maximum length of 100 meters Checking the quality of the cables and outlets used to connect the hub to end nodes and to the wall a...

Страница 26: ...104 F Storage 25 C to 70 C 13 F to 158 F Humidity 5 to 95 non condensing Net Weight 900g 1 98lbs FDH 616 Standards IEEE 802 3 10BASE T IEEE 802 3u 100BASE TX Ports 16 x 10BASE T 100BASE TX ports and...

Страница 27: ...ticular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on the user is encouraged to try to cor...

Отзывы: