214367
47
Revision A
1008806
B
A
Figure 3.90: Header Support
8.
Drive the windrower slowly forward until the windrower
feet (A) enter the header supports (B). Continue to drive
slowly forward until feet engage the supports and
header nudges forward.
9.
Ensure that lift linkages are properly engaged in
header legs.
1016903
A
B
C
Figure 3.91: Center-Link
10. Adjust position of the center-link cylinder (A) with the
switches on the GSL until the hook (B) is above the
header attachment pin.
IMPORTANT:
Hook release (C) must be down to enable self-locking
mechanism. If the release is open (up), manually push it
down after the hook engages the header pin.
11. Lower center-link (A) onto the header with REEL
DOWN switch on GSL until it locks into position (hook
release [C] is down). Refer to Figure
for
GSL controls.
12. Check that the center-link is locked onto header by
pressing the REEL UP switch on the GSL. Refer to
Figure
for GSL controls.
CAUTION
Check to be sure all bystanders have cleared the area.
13. Start engine.
1014786
A
Figure 3.92: GSL
14. Press HEADER UP switch (A) to raise header to
maximum height.
15. If one end of the header does
NOT
fully raise, rephase
the lift cylinders as follows:
a.
Press and hold HEADER UP switch (A) until both
cylinders stop moving.
b.
Continue to hold the switch for 3
–
4 seconds.
Cylinders are now phased.
16. Stop the engine, and remove the key.
Содержание R85
Страница 2: ...R85 Rotary Disc 4 9 Meter 16 Foot Self Propelled Windrower Header 1005291 Published August 2017 ...
Страница 6: ......
Страница 88: ......
Страница 121: ......