![MacDon D130XL Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/macdon/d130xl/d130xl_assembly-instructions-manual_685666025.webp)
8.
40–45 Foot Headers:
With the sling supporting the
hose management arm, cut and remove the wire (A)
that secure it to channel latch on top of header
frame tube.
Figure 3.5
9.
With the help of the sling,
position the hose
management arm (A) as shown.
Figure 3.6: Hose Management Arm in Field
Position
214017
19
Revision A