3
Attaching Header to Windrower
Perform all the procedures in this chapter in the order in which they are listed.
3.1
Installing the Hydraulic Hose Management Arm
The hydraulic hose management arm should be properly installed from shipping position to working position.
Lifting equipment is required to complete this task; the hydraulic hose management arm weighs approximately
120 lb. (54 kg).
NOTE:
Hydraulic hoses were removed from the illustrations in
this procedure to show clarity.
1.
Cut and remove the wire (A) securing the hydraulic
hose management arm (B) to the diagonal brace (C).
Figure 3.1: Hydraulic Hose Management Arm
2.
Position a sling on top of the gas spring cylinder (B)
and around the support arm (C).
3.
Cut cable tie (D) and remove the latch support
assembly (E) from the hydraulic hose management
arm (A). Retain for reassembly.
Figure 3.2: Hydraulic Hose Management Arm in
Shipping Position
214017
17
Revision A