![background image](http://html1.mh-extra.com/html/macdon/b6604/b6604_installation-instructions-manual_3192443019.webp)
214679
13
Revision B
4
Operation
Installation of this kit requires the following software versions installed in the windrower:
•
Harvest Performance Tracker (HPT) software: Install_SPW_HPAH203586K_.efs or newer
•
Master Controller software: MCAH203587M.ida4 or newer
Figure 4.1: HPT Screen Display
1.
Turn ignition ON. HPT will display auger header (A) as
attached.
Figure 4.2: HPT Screen Display
2.
Press soft key 5 on the HPT to open the main menu (A),
or press SHIFT and SELECT on the ground speed
lever (GSL).
3.
Using the HPT scroll knob, navigate to setup (B), then
header setup (C). The HEADER SETUP page opens
and displays a list of different headers.
Figure 4.3: HPT Screen Display
4.
Select the header type currently attached to the
windrower: Auger or GSS Auger (A). A new
page opens.
NOTE:
The attached header always appears first on the list.