www.mac-srl.it
8
02_IN.Palmo_00 191203
P.01
0.00
+ 0.02
P.01
u.m.=m
5
6
7
8
3
1
2
GBR
Collocate the formwork supplied taking care to
place it fl at (centre the bubble) compared to the
road level.
Predispose a corrugated tube ø80 for the passage
of the electrical power cables in the pre-holes of
the formwork.
CAUTION: place the foundation formwork
based on the direction of traffi
c as in the view
from the above.
N.B:
Position the bollard so as to protrude 20mm from
the fl oor level (in order to limit the enter of rainwater
in the little well).
Gradually insert the concrete verifying that the hole is
fi lled uniformly. Deal the concrete so as to not to leave
empty pockets of air, especially below the bollard.
1. Screw off the 4 (four) bolts (using the Allen key).
2. Extract the trampling platform.
3. Insert the eyebolts.
4. Extract the extractable structure.
To lift the extractable structure, it is necessary a lifting arm.
Lead the cables from the cockpit to the buried formwork.
Содержание C140G
Страница 11: ...info mac srl it 11 02_IN Palmo_00 191203 GBR ...
Страница 12: ...www mac srl it 12 02_IN Palmo_00 191203 GBR ...