BOLLARD LAYING PROCEDURE

Proceed  with  the  realization  of  the  drain  of  the 
rainwater  through  the  lay  of  a  PVC  pipe  with 
100mm  diameter.  This  pipe  must  be  connected 
to  the  sewer  system  or  in  alternative  to  a  well 
equipped  by  an  emptying  system  with  a  greater 
depth.

Insert  gravel  with  grain  22/32  mm  diameter  and 
220m height. In order to avoid “retreats of settling”, 
it is advisable to compact the gravel.

Insert  a  geotextile  layer  (gr.  300)  on  the  compacted 
gravel.

Put  the  PVC  pipe  (diameter  of  100  mm  and  length 
200mm) in  the  middle  of  the  dig  on the  geotextile  (the 
PVC pipe is necessary for the passage of the rain-water).

The size “

h

” are very important to ensure 

that the formwork protrudes 20mm from the 

trampling line.

Содержание C140G

Страница 1: ...00_FS 00 200221 C275G C200G C140G MANUAL GBR CAREFULLY READ THE MANUAL BEFORE USE Customer Timbre Signature Installing Company Timbre Signature ...

Страница 2: ...IMENSIONS 3 WARNING 4 SHIPPING 4 WASTE DISPOSAL 4 TRANSPORT AND LIFTING 4 D P I FOR THE OPERATOR 4 WARNINGS FOR THE MAINTENANCE TECHNICIAN 5 PREPARATION OF THE EXCAVATION 6 BOLLARD LAYING PROCEDURE 7 OPERATION OF ASCENT AND DESCENT 10 GBR SUMMARY ...

Страница 3: ...info mac srl it 3 00_FS 00 200221 B D C A C275G A B C D 275 500 481 731 700 931 800 1031 C200G A B C D 200 500 330 735 700 935 800 1035 C140G A B C D 140 500 276 735 700 935 800 1035 GBR DIMENSIONS ...

Страница 4: ...s are accurately checked and tested by the manufacturer before the shipping At the moment of delivery check if the bollard has been damaged during the transport Moreover check that nothing has been rigged or removed In case of noticing damages or missing parts warn the courier and the manufacturer sending them related photo documentation WASTE DISPOSAL MAC s r l recommends to respect the environme...

Страница 5: ...he non compliance of its products and accessories installation methods The maintenance technician must insert the protections against the indirect contacts upstream of the power line following the regulations in force according to the installation place Check that upstream of the plant there is a differential magnetermic switch with a 0 03 A threshold The control unit main power line must be direct...

Страница 6: ...en thought for land with poor draining qualities where digging water is immediately found and or where there is not the possibility to carry everything in a sewer system The bollard will be collocated in a waterproof concrete tank so if the water level raises the bollard remain isolated from the surrounding land This drawing shows how to install a well for the discharge of the excessive water from...

Страница 7: ... a well equipped by an emptying system with a greater depth Insert gravel with grain 22 32 mm diameter and 220m height In order to avoid retreats of settling it is advisable to compact the gravel Insert a geotextile layer gr 300 on the compacted gravel Put the PVC pipe diameter of 100 mm and length 200mm in the middle of the dig on the geotextile the PVC pipe is necessary for the passage of the ra...

Страница 8: ...in the view from the above N B Position the bollard so as to protrude 20mm from the floor level in order to limit the enter of rainwater in the little well Gradually insert the concrete verifying that the hole is filled uniformly Deal the concrete so as to not to leave empty pockets of air especially below the bollard 1 Screw off the 4 four bolts using the Allen key 2 Extract the trampling platform 3...

Страница 9: ...191203 9 u m m 0 00 0 00 0 02 P 02 0 02 P 02 u m m 0 00 0 00 0 02 GBR N B Make the connection N B Remove the protections of polystyrene from the runner Make sure that the concrete is solidified before to insert the extractable structure ...

Страница 10: ...rn the key counterclockwise until the stop be careful in the opening mechanism there is a gas spring the bollard goes up Descent of the bollard open the cover on the head of the bollard insert the key supplied push the head of the bollard and at the same time turn the key counterclockwise until the stop be careful in the opening mechanism there is a gas spring lower the bollard by pushing it down ...

Страница 11: ...info mac srl it 11 02_IN Palmo_00 191203 GBR ...

Страница 12: ...www mac srl it 12 02_IN Palmo_00 191203 GBR ...

Отзывы: