6
3.2 Necessary documentation
Operation
Manual
Inspection
record
3.3 Components of the delivery
MAC PARA Aegis SQ Rescue
Aegis SQ Inner container (Tube container or 4-Leaf Container)
Aegis SQ Pack instructions (in the operations manual for free download)
Aegis SQ Inspection record
Aegis SQ Operation manual
The operation manual is available for download at www.MAC PARA.com
3.4 Quality assurance
The MAC PARA rescue devices go through a step by step control during the whole
production. After every step, the product is accurately checked and only after a
successful pass of the test the following step will be started. The fabric, the straps, lines
and also the sewing machines are verified before use. Continuous quality controls of the
production process ensure an error-free production.
Each rescue unit is subjected to a strict final inspection before it leaves our
factory.
3.5 Materials used
The materials used were selected very carefully and under the strictest quality
standards. So we choose a 27g uncoated rip-stop nylon fabric from UTT. This meets the
required strengths, convinced by good workmanship and promises a longer life. The
main seams are including a webbing, which enhance the strength of the canopy.
The lines are made out of high-strength Dyneema for an enormous weight reduction.
Only the middle lines are made out of polyester. The connection of the lines to the
canopy are also made out of polyester and corresponds to the international parachute
workmanship.