21
The line bundles are stowed in the
pocket of the line bag of the inner
container.
From the last line groups to the main
riser should be left 40 cm of lines for
closing the cover part.
The leafs 1 - 4 of the inner container
will be closed with the black rubber line
loop in the correct order.
The black rubber line is fixed on leaf
no. 1, leads trough the grommet and
makes a line loop. The leaf no. 1 with
the black rubber line loop is placed first
on the canopy.
You can use a plastic line for closing
the innec container.
Lead the black rubber loop trough the
grommet of the leaf no. 2.