Due to individual site variations, exact 

guidelines for every situation cannot be 

supplied. The recommended framing and 

dimensional requirements shown are 

for a typical application and may vary, 

depending on site requirements.

The dimensions shown in Figure 1 and the 

table are from the surfaces where the unit 

will be attached.

RECESS INSTALLATION 

See Figure 2 

This diagram illustrates a typical 

installation for showers that NO RECESS 

NECESSARY have vertical thresholds 3/4” 

to 2” high. The recess allows the shower to 

be installed below the finished floor level. 

The recess is deep enough so the shower 

threshold will be at the acceptable height 

above the finished floor. An alternative to 

the recessed installation is to either build 

up the entire room floor to be even with the 

top of the threshold, or to construct a ramp 

to the shower entry. 

NO RECESS INSTALLATION 

See Figure 3 

This diagram illustrates a typical installation 

for showers that do not require recessed 

installation to comply with ADA guidelines. 

This style shower is illustrated in Figure 2. 

They are for 36” x 36” inside dimension 

showers with vertical thresholds no higher 

than 1/2”.

No recess necessary

installation.

10” area around drain

recessed1/2 inch

(Minimum)

lcove

with recess or pit built

r.

10” area around drain

recessed1/2 inch

Figure 2

Figure 3

10” area around drain 

recessed 1/2 inch

(Minimum)

Shower framing alcove 

with recess or pit built 

into sub-floor.

10” area around drain 

recessed 1/2 inch

(Minimum)

No recess necessary 

installation.

Содержание 106630

Страница 1: ...nce only Any critical dimensions required for installation should be taken directly from the unit being installed Any independent changes made to the unit or to any options and accessories supplied wi...

Страница 2: ...l directly on the sub floor and others will require a recess or pit These shower bases require special preparation of the installation site and very specific installation procedures to assure the show...

Страница 3: ...ill be at the acceptable height above the finished floor An alternative to the recessed installation is to either build up the entire room floor to be even with the top of the threshold or to construc...

Страница 4: ...ean the area of all dirt trash oil grease water and other contaminants that may affect adhesion 4 Apply 100 silicone caulking bead wide by high around the box out See Figure 5 5 Apply 4 100 silicone c...

Страница 5: ...ensure the unit has proper slope and drainage If unit does not drain properly the unit must be pulled back up to determine where the problem lies This should be done immediately after step 12 before...

Страница 6: ...oivent tre prises directement partir de l unit en cours d installation Toutes les dimensions des unit s publi es sont titre de r f rence seulement Toutes les dimensions critiques requises pour l insta...

Страница 7: ...lacer le carton du carton dans le bas de la base de douche pendant l installation pour viter d endommager la surface finie Lorsque vous placez la base de douche dans l alc ve du cadre vous pouvez util...

Страница 8: ...uche soit la hauteur acceptable au dessus du sol fini Une alternative l installation encastr e consiste soit construire tout le sol de la pi ce pour tre au m me niveau que le haut du seuil soit constr...

Страница 9: ...t rieure et le drain Voir figure 4 REMARQUE VOUS N AVEZ PAS BESOIN DE REMPLIR L EMPLACEMENT DU DRAIN AVEC DU MAT RIAU DE LITERIE 6 Ensuite appliquez un cordon continu de calfeutrage 100 silicone de la...

Страница 10: ...vide pas correctement l unit doit tre tir e vers le haut pour d terminer o se situe le probl me Cela doit tre fait imm diatement apr s l tape 12 avant que les mat riaux aient eu la possibilit de prend...

Страница 11: ...la instalaci n debe tomarse directamente de la unidad que se est instalando Cualquier cambio independiente realizado a la unidad o cualquier opci n y accesorio suministrado con la unidad m s all de lo...

Страница 12: ...SUJETA A LA APROBACI N DEL C DIGO Consulte las impresiones de trabajos y o consulte con el arquitecto para ver si su instalaci n debe cumplir con ADA Estas unidades de base de ducha se instalan de man...

Страница 13: ...a est a la altura aceptable sobre el piso terminado Una alternativa a la instalaci n empotrada es construir todo el piso de la habitaci n para que est nivelado con la parte superior del umbral o const...

Страница 14: ...a pared exterior y el drenaje Ver Figura 4 NOTA NO NECESITA RELLENAR LA UBICACI N DEL DRENAJE CON MATERIAL DE CAMA 6 Luego aplique un cord n continuo de calafateo de silicona 100 de de ancho x 3 8 de...

Страница 15: ...ser jalada hacia arriba para determinar d nde se encuentra el problema Esto debe hacerse inmediatamente despu s del paso 12 antes de que los materiales hayan tenido la oportunidad de fraguar Ver Figur...

Страница 16: ...ccessing product Limited warranty please visit www maax com us warranty MAAX Bath Inc offers express limited warranty on each of its products This warranty extends only to the original owner end user...

Отзывы: