12
0697-401 Pump
werke - 04/2021
en
►
Empty pump tube:
- Pump tube RE SS for complete drum
drainage: Pull lever A to unlock, and turn to
home position (
→
Fig 6, item 2).
- Pump tube RE PP for complete drum
drainage: Pull lever B to unlock. Pull lever A
into its home position (
→
Fig. 7, item 2).
Lever position Meaning
0
Pump tube closed
I
Pump tube open
Tab. 6: Markings on pump tube for complete drum
drainage
6.2 Mixing fluids (pump tube MP)
!
WARNING
Danger of injury and intoxication when
handling hazardous liquids!
►
The drum must always be covered during the
mixing process.
►
Activate lever A and set to "mix" for mixing
operation (
→
Fig. 8).
►
Close the pump outlet to improve the mixing
efficiency (e. g. close the nozzle).
►
Activate lever A to end mixing and select the
setting "pump" (
→
Fig 8).
6.3 Taking out of operation
!
WARNING
Danger of injury and intoxication when
handling hazardous liquids!
►
Always wear protective equipment when
working on the pump.
►
Let the pump cool down after pumping hot
liquids.
►
Carry the pump by the handwheel and drive.
►
Collect any residual leaking fluids from
the pump safely and dispose of it in an
environmentally friendly fashion.
NOTICE
Damage to property with horizontal storage
of a pump tube wetted with fluid!
►
The pump tube must always be stored on the
wall bracket (
→
Fig. 9).
►
Remove the pump tube from the container
carefully and allow the remaining liquid to flow
back into the container.
►
After pumping aggressive, tacky, crystallizing
or contaminated liquids the pump tube must
be flushed and cleaned with an appropriate
detergent (
→
Fig. 10).
7. Maintenance and servicing
!
WARNING
Danger of injury and intoxication when
handling hazardous liquids!
►
Always wear protective equipment when
working on the pump.
►
Complete emptying of pump tube.
7.1 Observance
►
Only use a non-leaking pump tube:
The pump must be switched off and repaired
immediately if liquid leaks out of the pump
tube below the handwheel
►
With sealless pump tubes: Ensure that the
openings above the pump foot are never
clogged.
7.2 Maintenance
Change the seal ring bracket with pump tube
PP 41 MS
►
Change the seal ring bracket in accordance
with the instructions (
→
Fig. 11).
Содержание Alu 41-L-DL
Страница 2: ...Fig 1 Fig 5 Fig 3 Fig 2 Fig 4 Fig 6 Pump tube RE SS 0697 401 Pumpwerke 04 2021...
Страница 3: ...Fig 8 Fig 9 Fig 10 Fig 7 Pump tube RE PP 3 0697 401 Pumpwerke 04 2021...
Страница 4: ...Fig 11 4 0697 401 Pumpwerke 04 2021 en...
Страница 20: ...20 0697 401 Pumpwerke 04 2021 en...
Страница 21: ...21 0697 401 Pumpwerke 04 2021 en...