Roof
7.
Before starting the installation of the roof, make sure that the walls are straight, the door and windows function
and the whole cabin is in the right angle.
The roof boards have been planed to a softline profile. The visible, rounded side is facing downwards (into the
cabin).
The backside of the board can be dull-edged (as the floor boards). As mentioned above, this is not a fault. This
side will be covered with asphalt felt
Begin fastening the roof boards with nails according to the
so that the groove is facing outwards.
Make sure that the roof boards do not go over the middle of the ridge beam and fasten them with nails to the
side walls and all three purlins.
Again it is advisable to leave a space of 1 - 1,5 mm between the boards because the wood shrinks and expands
according to the weather
When you are fastening
, do not nail it immediately, but check first how far it reaches and
saw away the extra part, if necessary according to
When both sides of the roof are finished, fasten the
BE CAREFUL WHEN INSTALLING THE ROOF, WE DO NOT RECOMMEND WALKING ON
THE ROOF!
Note: make sure that the eaves of the roof are straight and that the boards
do not go over the middle line of the ridge beam.
.
the last roof board
fascia boards K8/K9, picture 10.
picture 9
picture 9.
the
Important!
After nailing the roof boards they must be covered immediately!
10
K8/K9
K7
K6
10.
9.
Sawing
Start
Finish
Lillevilla 100 C-3 English 220109