7 OPERATION/USE
LUMINELL SWEDEN AB
47
PREVENTIVE MAINTENANCE PLAN
Preventive maintenance tasks shall be done according to the following plan:
Task
Frequency
Perform a function test.
Start up the searchlight system, rotate the searchlight in
horizontal and tilt the vertical direction up/down a few times.
Every week if not used
during this period.
Make visual inspection of the searchlight housing
.
Look for any potential mechanical damage caused by
external force. A damage can lead to reduced or non-
functionality.
Every month
Clean the searchlight housing.
Rinse carefully with fresh water to wash away the salt
deposits.
If dirtier, use a very soft sponge and soap that is not caustic,
contains strong solvents such as acetone or thinner base.
Ensure that the heatsink is kept free of dirt and debris as
this affects the cooling capacity.
Under no circumstances can the searchlight be washed
with high pressure water as this can lead to penetration
inside the housing followed by potential electrical and
mechanical problem.
Every six month
Make a visual inspection of the searchlight front glass
and its sealing.
Verify that the sealing is undamaged, there must absolutely
be no loose sealant, this must be corrected as soon as
possible.
Verify that the glass is without any cracks or deep
scratches.
A crack can lead to water penetration inside the housing
followed by potential electrical and mechanical problem.
Scratches can reduce light performance.
Every 12 months
Deicing
.
Wintertime the system should be deiced with caution. First
turn the lights on to let the heat melt the ice before operating
the system horizontally and vertically.
When necessary
Содержание 7072720003985
Страница 1: ...Version 1 0 20200316 BY LUSEARCHLIGHT SYSTEM BY LUMINELL INSTALLATION USER S MANUAL V1 1_18 09 2020...
Страница 5: ...LUMINELL SWEDEN AB 5 Table of Contents Connection example 1 default 24Vdc 24...
Страница 19: ...6 Install the Product LUMINELL SWEDEN AB 19 Mechanical drawing SL1...
Страница 20: ...6 Install the Product LUMINELL SWEDEN AB 20 Mechanical drawing SL1 base measurements...
Страница 21: ...6 Install the Product LUMINELL SWEDEN AB 21 Mechanical drawing Operator panel...
Страница 22: ...6 Install the Product LUMINELL SWEDEN AB 22 Mechanical drawing Operator panel base...
Страница 23: ...6 Install the Product LUMINELL SWEDEN AB 23 SL1 ELECTRICAL SL1 electrical system overview...
Страница 25: ...6 Install the Product LUMINELL SWEDEN AB 25 Connection example 2 24Vdc...
Страница 26: ...6 Install the Product LUMINELL SWEDEN AB 26 Connection example AC using an external PSU optional...
Страница 30: ...6 Install the Product LUMINELL SWEDEN AB 30...
Страница 41: ...7 OPERATION USE LUMINELL SWEDEN AB 41 3 Surveillance To be added...
Страница 57: ...10 DISPOSAL LUMINELL SWEDEN AB 57 DISPOSAL To be continued check homepage for new manual version...
Страница 59: ...12 INDEX LUMINELL SWEDEN AB 59 INDEX A B...
Страница 60: ...13 GLOSSARY LUMINELL SWEDEN AB 60 GLOSSARY...
Страница 61: ...13 GLOSSARY LUMINELL SWEDEN AB 61 APENDIX 1 CE Declaration of conformity...
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......