4 Technical Data
LUMINELL SWEDEN AB
14
OPERATOR PANEL
Technical Data Operator Panel
Input
Nominal voltage
24VDC (20...28VDC)
Power consumption in operation
Max 10W
Power consumption in standby
mode (parked, light off)
2,2W
Current at 24V
Max 0,4A
Installation
Electrical interface to vessel
-
DC power 3 wires (+/-/earth) (see drawing on page XX for details)
-
Ethernet to operator control panel or switch (if any)
Mechanical interface to vessel
-
3 x threaded rod M4 in panel base
-
Sealing between vessel and panel
Start-up
System boot time
(from power off)
≈30 sec (searchlight homing procedure)
Environmental
Operating ambient temperature
-20ºC to +55ºC
Storage temperature
-25°C to +70°C
IP class
IP56
Vibration
Designed for IEC 60945
Shock
Designed for IEC 60945
Dimensions & weight
Static size
19 x 40 x 42 cm (see drawing on page XX for details)
Weight
0,5kg
Materials & Colors
Body / casing
Operator panel made in PC-ABS
Base, bolts
Stainless steel AISI 316L (1.4404), A4
Electrical interface to vessel
-
DC power 3 wires (+/-/earth) (see drawing on page XX for details)
-
Ethernet to operator control panel or switch (if any)
Functions
Direct button functions
-
Horizontal and vertical movement
-
Light on/off
-
Wave compensation on/off
(firmware update, scheduled Q2 2021)
-
Hold light direction on/off
(firmware update, scheduled Q2 2021)
-
Beam angle spot/flood
-
Dimming step by step
Standard menu functions
-
Custom home screen
– set your 4 most used functions
-
Up to 4 programmable fixed positions
-
Sweep in horizontal direction
-
Surveillance in horizontal and vertical direction
-
Switch
– to another potential SL1 in the network
-
Sync
(firmware update, scheduled Q4 2020)
Содержание 7072720003985
Страница 1: ...Version 1 0 20200316 BY LUSEARCHLIGHT SYSTEM BY LUMINELL INSTALLATION USER S MANUAL V1 1_18 09 2020...
Страница 5: ...LUMINELL SWEDEN AB 5 Table of Contents Connection example 1 default 24Vdc 24...
Страница 19: ...6 Install the Product LUMINELL SWEDEN AB 19 Mechanical drawing SL1...
Страница 20: ...6 Install the Product LUMINELL SWEDEN AB 20 Mechanical drawing SL1 base measurements...
Страница 21: ...6 Install the Product LUMINELL SWEDEN AB 21 Mechanical drawing Operator panel...
Страница 22: ...6 Install the Product LUMINELL SWEDEN AB 22 Mechanical drawing Operator panel base...
Страница 23: ...6 Install the Product LUMINELL SWEDEN AB 23 SL1 ELECTRICAL SL1 electrical system overview...
Страница 25: ...6 Install the Product LUMINELL SWEDEN AB 25 Connection example 2 24Vdc...
Страница 26: ...6 Install the Product LUMINELL SWEDEN AB 26 Connection example AC using an external PSU optional...
Страница 30: ...6 Install the Product LUMINELL SWEDEN AB 30...
Страница 41: ...7 OPERATION USE LUMINELL SWEDEN AB 41 3 Surveillance To be added...
Страница 57: ...10 DISPOSAL LUMINELL SWEDEN AB 57 DISPOSAL To be continued check homepage for new manual version...
Страница 59: ...12 INDEX LUMINELL SWEDEN AB 59 INDEX A B...
Страница 60: ...13 GLOSSARY LUMINELL SWEDEN AB 60 GLOSSARY...
Страница 61: ...13 GLOSSARY LUMINELL SWEDEN AB 61 APENDIX 1 CE Declaration of conformity...
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......