Novus Spectra
0642-543-01, Rev A, 12/02
16
General Operation
Plugging in the main power cable
1
Ensure that the keyswitch is in the
(off ) position.
2
Insert the mains power plug into the mains receptacle on the rear of the laser
console.
3
Insert the other end of the main power plug into the wall socket and ensure
that the plug is secure.
To electrical
outlet
Mains receptacle
Plugging in the main power cable
Содержание Novus Spectra
Страница 1: ...Novus Spectra Solid State 532 nm Green Laser Operator Manual...
Страница 6: ...6 Contents Novus Spectra 0642 543 01 Rev A 12 02...
Страница 8: ...Novus Spectra 0642 543 01 Rev A 12 02 8 General Operation...
Страница 40: ...Novus Spectra 0642 543 01 Rev A 12 02 40 General Operation...
Страница 42: ...Novus Spectra 0642 543 01 Rev A 12 02 42 Maintenance...
Страница 56: ...Novus Spectra 0642 543 01 Rev A 12 02 56 Safety and Regulatory...
Страница 72: ...Novus Spectra 0642 543 01 Rev A 12 02 72 Indications for Use...
Страница 110: ...Novus Spectra 0642 543 01 Rev A 12 02 110 Indications for Use...