![Lumag BSW66GL Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/lumag/bsw66gl/bsw66gl_operators-manual_1947380010.webp)
9
#1 – INSPECTION
Take all of the parts out of the shipping crate and lay them out. Check for any damage or missing parts.
#2 – TRACKS
Assemble track system and secure loosely with provided nuts & bolts. It is important not to fully tighten the bolts at this
stage. This will be done after the head is assembled and rolled along the track. It is ideal to assemble the tracks on a
solid and level footing that is a minimum of 4” off of the ground. This will allow for easy cleanup of sawdust from under
the tracks and height adjustment of the log supports.
Attach track cross supports to “L” channel with the provided nuts & bolts. The joining plate
(
assembled under two rails
)
is used at the seam joint to join the two sections together (shown in right images). Ensure to only hand tighten at this
stage. The bolts will be fully tightened once the head assembly is free to roll on the tracks and provide the correct track
width.
Assemble carriage stops at the ends of the tracks (4 stops total) and tighten.
#3 – LOG DOG & SUPPORTS
Содержание BSW66GL
Страница 2: ......