Operating Manual CHM 15k
R13 / 07-2019
Installation
18
Position the CHM 15k in the installation position (vertical) on the concrete foundation.
It is important to
pay attention to the position of the exterior door in relation to the operator’s
connection box (see Figure 4)
Loosely pre-assemble the CHM 15k on the concrete foundation with the supplied washers
and fixing screws (see Figure 9)
Figure 9
Fixing elements.
1 Dowel S12
2 Leveling screw 5 mm (integrated into the base of the device)
3 Screw DIN 571-10 x 140-ZN
4 Washer ISO 7093-10.5-A2
5 Washer ISO 7093-10.5-KST/PA
6 Concrete foundation
Vertically align the CHM 15k using the levelling screws integrated into the base of the device
(with a spirit level: place on one side wall and on the front)
Tighten the fixing screws (nuts)
Remove the handle protection (edge protection profile) from above and secure in the base
for the next transport
Содержание CHM 15k
Страница 1: ...General Information 1 Titelseite...
Страница 73: ...Index of Tables 73...