Note that if the E1 interfaces are used, four VC12s of the first VC4 must be reserved
for E1 transport. In this case, it is mandatory to substructure the first VC4 to carry 63
VC12s.
The system automatically detects if the combination of slot number, main unit, and
tributary unit allows 16 VC4 backplane capacity. No provisioning is required.
The following VC/VCG mapping diagram displays bandwidth selection options for the
WAN ports 1, 2, 3, and 4.
The following VC/VCG mapping diagram displays the bandwidth selection options for
the WAN ports 5, 6, 7, and 8.
Jumbo frame support
Product description
Introduction
....................................................................................................................................................................................................................................
365-312-847R4.0
Issue 4, November 2006
Lucent Technologies - Proprietary
See notice on first page
2-23