Lucent Technologies Lineage
®
2000 ECS Battery Plant H569-403
Issue 4 February 1997
Installation 4 - 7
Controller and
LVD Set-up
Follow the controller set-up procedure given in the Controller
manual to complete the steps below.
1. Enable/disable equalize charge set-up
2. Enable/disable rectifier restart set-up
3. Set HV shutdown level(s)
4. Set BD alarm level
5. Run office alarm wiring
6. Run other controller wiring
7. Set-up other optional circuit packs
Check and set the low-voltage disconnect/reconnect, if
provided, at the desired voltage level. See Figure 4-3 for the
location of the disconnect voltage select jumpers, J505.1 and
J505.2 on CP5 Fuse Board. Plug these jumpers across pins 1 and
2 of their respective connectors to provide a disconnect voltage
of 21.25 +/-0.5 volts. To provide a disconnect voltage of 20.25
+/-0.5 volts, plug the jumpers across pins 2 and 3 of their
respective connectors. Refer to the ECS controller manual for
acceptance testing procedures for the CP5 circuit pack and the
associated LVD/R option.
Figure 4-3: LVD/Fuse Board (CP5) Jumper Locations