4-22
October, 1998
GRF 400/1600 Getting Started - 1.4 Update 2
Initial System Set-up
What to do next
What to do next
At this point the GRF is powered, the administrative LAN is connected, and you have
completed initial system IP configuration using the first-time configuration script. You should
also have configured system logging.
The next chapter describes media card cabling requirements and ways to check out and verify
those connections. After attaching media card cables, use the GRF Configuration and
Management manual to complete system and media card configuration.