Lucent Technologies Galaxy Power System 4804AP H569-450
Issue 1 June 2000
Installation 11 - 35
Thermal Probe Connections, continued
Connecting
Thermal Probe
Cable Assembly to
a BLJ Board
This procedure is for connecting the Thermal Probe Cable Assembly to
the BLJ board. If installing 210E modules, skip to “Connecting a 210E
Module to a BLJ Board.”
•
One thermal probe can be connected to Millennium or SCF systems
(through the BLJ board).
•
Up to four thermal probes can be connected to Vector systems
(through the BLJ board).
Connecting Thermal Probe Assembly to a BLJ Board
Step
Action
1
Connect Thermal Probe Cable Assembly (847307410 – 10
feet (3 meters) or 848314563 - 16 feet (4.88 meters) to the
BLJ Board. Use a piece of small gauge wire (26-22 gauge) to
make the enable strap connection.
2
Proceed to “Connecting Thermal Probe Cable Assembly to
Ring Type or Paddle Type Probes.”
Figure 11-22: Thermal Probe Cable Assembly Connection
to BLJ Board
ALARM OUTPUTS
ALARM INPUTS
91
85
87
93
89
95
86
88
90
92
94
ABS
DG
96
79
81
83
80
82
84
73
75
77
74
76
78
67
69
71
68
70
72
61
63
65
62
64
66
55
57
59
56
58
60
49
51
53
50
52
54
43
45
47
44
46
48
37
39
41
38
40
42
31
33
35
32
34
36
25
27
29
26
28
30
19
21
23
20
22
24
13
15
17
14
16
18
7
9
11
8
10
12
1
3
5
C
O
R
C
ALARM
OUTPUTS
ALARM OUTPUTS
ALARM INPUTS
R
O
2
4
6
To Thermal Probes
Thermal Probe Cable Assembly
EN1
RTH1+
RTN1
RTN2
RTN3
RTN4
RTH2+
RTH3+
RTH4+
EN4
EN2
EN3
Position 1
Position 2
Position 3
Position 4
Use Positions 1 Through 4 with Vector Controller
Use Position 1 with
Galaxy Millennium
Enable strap must be connected
for each used thermal probe position.
847307410
848314563
- 10 feet (3 meters) or
- 16 feet (4.88 meters)
BLJ Board