Lucent Technologies Lineage
®
2000 Battery Management System ED-83241-30
3 - 8 Installation
Issue 5 March 1997
Remove Original
Distribution
Door Assembly
1. Cut all cable ties anchoring cables to the distribution
assembly door.
2. Disconnect cables to P501, P502, P504 and P506.
3. Remove the three nuts and washers that secure the door
assembly to the frame.
4. Remove the door assembly.
Battery
Management
System
Installation
1. If plant is equipped with a contactor place the Battery
Management System label above Fail/Open LEDs on front
panel, if there is no contactor place this label over these
LEDs.
2. Note which circuit breaker positions are being utilized on
the original distribution door. Remove the circuit breaker
knockouts for the corresponding circuit breaker positions.
Or, the old circuit breaker panels can be removed from the
original distribution door and installed in place of the
panels in the new door.
3. Verify that the ENABLE/DISABLE switch is disabled.
4. Install the Battery Management System assembly on the
three studs the original door assembly was installed on,
using the original nuts and washers.
5. Reconnect LVD cable sets to P501, P502, P504, and P506
as labeled on the new back cover.
6. Fold extra length of ribbon cable and anchor under plate.
7. Make sure to dress ribbon cable with sufficient slack
across hinge to permit full opening of distribution
assembly door.
8. The Faston connector located on the discharge return bus
and connected to a blue wire requires bending towards the
back of the distribution assembly to avoid door
interference.
Caution
Verify clearance of circuit breakers to door knockout
positions by carefully closing the door.