![Lubeworks 1813351 Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/lubeworks/1813351/1813351_instruction-manual_1945588004.webp)
OPERATION
The Digital Meter requires 1 Alkaline cell 9V batteries to operate (batteries included). For
battery replacement, refer to Section D, Battery Replacement elsewhere in this manual.
1. Keypad Buttons
Press to enter the quantity to be dispensed.
AUTO
Press to enter and exit the AUTO Mode.
RESET
Press in Manual or AUTO Mode to clear
the previously programmed batch and to
reset the meter.
OK/STOP
Press to confirm the Valve and to stop the
flow through a mechanical override.
2. INSTALLATION
A. Pre-installation Procedure
1) Relieve the system pressure
a) Turn off the power supply to the pump or close the shutoff valve.
b) Dispense any fluid in the system into a waste container by opening the dispense valve.
c) Open all bleed-type master air and fluid drain valve in the system.
d) Leave the drain valve open until ready to pressurize the system.
2) Close the shutoff valve.
3) Ground hoses and reels:
Grounding reduces the risk of static sparking; ground all system components according to
local, state, and federal codes. Consult the user’s manual on the pump and other system
components to ground the following:
a) Pump: follow manufacturer’s recommendations.
b) Air and fluid hoses: use only grounded hoses.
c) Air compressor: follow manufacturer’s recommendations.
d) Fluid supply container: follow the local code.
WARNING:
Do not use Teflon tape on pipe joints; it may cause a loss of grounding
across the joint.
B. Apply meter to hose
Close the drain valve before starting this procedure.
1. Attach swivel to meter .Apply thread seaiant to themale
end of the hose .Roconmmended sealant .
TECHNICAL
DETAILS
INTENDED USE
FACTORY SETTINGS
TOOL USE
EXPLODED AND
PARTS LIST
OPERATION
TROUBLE
SHOOTING GUIDE
E2
10
1
0.1
AUTO
RESET
OK/STOP