7 Maintenance
It is essential after delivery that adequate protection and inspection are carried out on the
equipment. This is especially important if there is any delay in installing or commissioning the
equipment. After commissioning and setting up the defrost systems, the heat exchanger will require
maintenance. Regular checks and good maintenance will ensure trouble free operation. The
frequency of checks will depend on site location and the specific operating conditions. Equipment
installed in industrial or coastal areas, or in any kind of aggressive environment, generally requires
more frequent inspections than the same equipment in rural, unpolluted areas. Damage can occur
during site installation and during the period prior to commissioning. Inspections and remedial
work should take place during this period. On sites where building work is in progress, it is strongly
advised that finned block, headers and return bends are covered up to keep them clean and
protected from damage until the time of commissioning.
Header and cooler tubes can be extremely cold! Take precautions when maintenance is carried out
near the header and cooler tubes.
Ensure complete electrical isolation before performing any maintenance activity.
7.1 Shut down periods
Even during prolonged shut down periods, maintenance should be carried out. If the shut down
period is extended, all electric motors should be run once every four weeks for a minimum of 4
hours. EC fans must be kept powered during shut down periods.
7.2 Moisture in the refrigeration system
Moisture in a refrigeration system is undesirable. Moisture can cause malfunctioning in the
refrigeration operation. A lesser known problem is that small amounts of moisture in the refrigeration
system can after a time cause leakage through the formation of frost clumps. These frost clumps
are the result of moisture seeping from the refrigeration system during defrost, as water seeps into
the soldering seams and then freezes, resulting in a volume increase. This process repeats itself
during each freeze/defrost cycle, as a result of which the cavities (potholes) thus formed become
steadily larger and ultimately burst, causing leakage.
7.3 Cleaning and disinfecting
A coil block should be kept clean to guarantee it works well. The user of the heat exchanger should
ensure that the cleaning and disinfecting agents that are used do not have a corrosive effect on the
materials used by Alfa LU-VE.
7.4 Casing
Casework checks should be carried out at least every 3 months. In doing so, inspect for any
deterioration of coating and/or corrosion. If such flaws are noted, take immediately remedial action.
Should any damage occur during installation, this should be repaired immediately to prevent further
deterioration.
7.5 Coil and driptray
The heat exchanger coil should be checked at least every 3 months, with close inspection being
carried out for such things as leaks or chafing of tubes. In addition, any unusual vibration of the
fans should be checked. The unit should be cleaned as instructed when necessary using low
pressure compressed air, and/or low pressure water hose or a mild detergent wash. Care must
be taken not to hose directly onto fan motors or electric control panels or the electrical connection
boxes of the heaters. It should be noted that abnormal atmospheric conditions can greatly harm the
lifetime of the finned coil.
Please ensure the drip tray is empty before it is disassembled. The weight of any leftover water
could injure the operator if the drip tray fell open accidentally.