Chapter 3 Installation and Test Operation
3 - 7
3.6 Test Operation
Terminal resistance switch of Pnet cable shall be On. If the switch is not On, communication errors
may occur. Check LED operation status if normal with power on after communication cable is
connected. If normal, download the applicable program to PLC via XG5000 so to execute the program.
3.6.1 Precautions for system configuration
1) Station No. of each slave shall be surely different from each other including this module. If
connected with the repeated station No., communication error may occur, leading to
communication trouble. High-speed link station No. of all stations also shall be different from
each other to use High-speed link service.
2) Use the communication cable as specified only. If not, serious error may occur to communication.
3) Check communication cable if disconnected or shorted prior to installation.
4) Tighten up communication cable connector until connected firmly. If cable connection is unstable,
serious error may occur to communication.
5) If remote communication cable is connected, keep the cable far away from power line or inductive
noise.
6) Since the coaxial cable is not flexible, it is to be diverged min. 30cm away from the connector in
communication module. If the cable is bent at a right angle or transformed compulsorily, cable
disconnection or connector damage in communication module will be caused.
7) If LED operation is abnormal, refer to Chapter 9 Troubleshooting to check for causes and take
actions against. Contact service center if the error is as before.
Содержание XBL-PMEC
Страница 50: ...Chapter 5 PROFICON Setting 5 18 Figure 5 4 8 Network topology collected and composed...
Страница 84: ...Chapter 7 Program Example 7 12 Figure 7 3 3 Screen of communication module setting...
Страница 91: ...Chapter 8 Troubleshooting 8 3 8 5 Troubleshooting 8 5 1 Connection error on PROFICON XG5000...
Страница 99: ...Appendix A 7 A 4 External Dimensions Unit mm XBL PMEC XBL PMEC...