LOVESHAW an
ITW
COMPANY 7
INSTALLATION
THE LD16A MACHINE IS SHIPPED COMPLETELY ASSEMBLED.
TO UNPACK MACHINE, LIFT OFF THE UPPER CRATE, THEN UNFASTEN SKID. LIFT MACHINE
FROM SKID AND PULL SKID AWAY. REMOVE ALL PACKING MATERIAL THAT IS USED TO SECURE
THE HEAD AND CARTRIDGE.
THE BED HEIGHT OF THE MACHINE SHOULD BE ALIGNED WITH THE ROLLER HEIGHT OF THE
CONVEYOR. THE MACHINE SHOULD BE CENTERED ON THE INFEED CONVEYOR ROLLER. THE
MACHINE SHOULD THEN BE LEVELED. THE STRIPPER PLATE SHOULD BE USED TO ADJUST ANY
MINOR HEIGHT DIFFERENCES.
AFTER THE MACHINE IS IN PLACE AND LEVEL, CONNECT THE MACHINE TO AN APPROPRIATE
GROUNDED ELECTRICAL CONNECTION, (SEE MACHINE SPECIFICATION LABEL FOR VOLTAGE).
CONNECT THE AIR SUPPLY TO AN AIR SOURCE. MINIMUM LINE PRESSURE - 70 LBS. (5 kg/cm
²
).
TO START MACHINE, LOAD THE TAPE CARTRIDGES WITH TAPE AND THREAD THE TAPE. SEE
TAPE THREADING DIAGRAM.
THE MACHINE IS NOW READY FOR OPERATION. PLEASE NOTE THAT IN ORDER TO START THE
MACHINE, THE SAFETY GATES MUST BE CLOSED. WHEN THE SAFETY GATES ARE OPENED, THE
MACHINE WILL AUTOMATICALLY SHUT DOWN.
Содержание LD16AP
Страница 14: ...LOVESHAW an ITW COMPANY 13 LOCATION OF LIMIT SWITCHES AND SOLENOID VALVES ...
Страница 37: ......
Страница 38: ......
Страница 39: ......