LOVESHAW an
ITW
COMPANY 11
THE TWO BELT TENSIONING BRACKETS ARE SPRING LOADED WITH TWO TENSION SPRINGS
ON EACH. CARE SHOULD BE TAKEN TO INSURE THAT THESE SPRINGS ARE ATTACHED TO THE
TENSION ROLLER BRACKET AFTER THE BELTS HAVE BEEN REPLACED.
TO REPLACE A BELT, BRING THE BELT LACING TOT HE TOP AND PULL THE LACING PIN. REPLACE
WITH NEW BELT. ONLY FACTORY SUPPLIED BELTS SHOULD BE USED TO AVOID MOTOR FAILURE
DUE TO EXCESSIVE FRICTION. EACH BELT IS REPLACED SEPARATELY, HOWEVER, IT IS ADVISABLE
TO REPLACE BOTH BELTS AT THE SAME TIME.
IF ONE OR BOTH BELTS AT THE EXIT END OF THE MACHINE TRAVEL TO THE LEFT OR RIGHT, THE
BELT LAGGING ON THE DRIVE ROLLERS MUST BE REPLACED.
TO REPLACE THE BELT LAGGING, FIRST REMOVE THE BELT THAT IS TRAVELING OUT OF LINE.
TURN MACHINE ON AND WITH A UTILITY KNIFE, CUT ABOUT 1/8” OFF THE BELT LAGGING WITH THE
POINT OF THE KNIFE WHILE THE DRIVE ROLLER IS TURNING. BE SURE TO PLACE THE KNIFE ON THE
ROLLER SO THAT THE ROLLER IS MOVING AWAY FROM THE POINT OF THE KNIFE, LIFT UP A SECTION
OF THE CUT LAGGING AND PULL OFF UNTIL IT IS REMOVED FROM THE DRIVE ROLLER COMPLETELY.
THIS CAN BE DONE BY JOGGING THE MACHINE ON AND OFF WHILE PULLING THE CUT STRIP OF
LAGGING. ATTACH NEW BELT LAGGING. REPLACE THE BELT AND CHECK ALIGNMENT. THE BELT
WILL HAVE MOVED TO THE OPPOSITE SIDE THAT WAS CUT. THIS PROCEDURE MAY HAVE TO BE
REPEATED UNTIL THE BELTS ARE CENTERED.
BELT DRIVE SYSTEM - HEAVY DUTY
THE TWO BELTS ARE DRIVEN BY A BELT PULLEY SYSTEM CONNECTED TO THE GEAR REDUCER
THROUGH A CHAIN DRIVE SYSTEM. IF THE CHAIN BECOMES LOOSE, LOOSEN FOUR REDUCER
BRACKET SCREWS AND DROP REDUCER DOWN UNTIL CHAIN BECOMES TIGHT. TIGHTEN SCREWS
WHEN ADJUSTMENTS HAVE BEEN MADE.
THE BELTS AT THE INFEED END OF THE MACHINE, TRAVEL OVER THE TENSION ROLLERS. THE
TENSION ROLLER BRACKETS HOLD TWO GUIDE ROLLERS EACH THAT AUTOMATICALLY CENTER
EACH BELT. THE BELTS THEN TRAVEL OVER THE IDLER ROLLER LOCATED AT THE INFEED END OF
THE MACHINE. TO REPLACE A BELT, BRING THE BELT LACING TO THE TOP. PULL THE LACING PIN
AND REPLACE THE BELT. ONLY FACTORY SUPPLIED BELTS ARE RECOMMENDED AND BOTH BELTS
SHOULD BE REPLACED AT THE SAME TIME.
THE TWO BELT TENSIONING BRACKETS ARE SPRING LOADED WITH TWO TENSION SPRINGS ON EACH.
CARE SHOULD BE TAKEN TO INSURE THAT THESE SPRINGS ARE ATTACHED TO THE TENSION ROLLER
BRACKET AFTER THE BELTS HAVE BEEN REPLACED.
IF ONE OR BOTH BELTS AT THE EXIT END OF THE MACHINE TRAVEL TO THE LEFT OR RIGHT, THE BELT
LAGGING ON THE DRIVE ROLLERS MUST BE REPLACED.
Содержание LD16AP
Страница 14: ...LOVESHAW an ITW COMPANY 13 LOCATION OF LIMIT SWITCHES AND SOLENOID VALVES ...
Страница 37: ......
Страница 38: ......
Страница 39: ......