![Loring S15 Falcon Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/loring/s15-falcon/s15-falcon_pre-installation-manual_1940790004.webp)
S15
Pre-Installation and Site Preparation Guide
Page 4 of 46
Loring Smart Roast Proprietary – This document is controlled by
Document Control. By printing this document, it will become a “Reference” copy.
Users are responsible for verifying that it is the latest revision available.
1008236 Rev B
Follow all written instructions provided by Loring, and verbal instructions from Loring Customer
Support, regarding site preparation prior to receiving the coffee roasting equipment.
All contractors or subcontractors involved in installation or working with specific connections (e.g.,
water, air, gas, electrical, hot and cold exhaust ventilation) should be fully licensed and qualified in
that particular functional area.
Comply with all applicable rules and regulations and governing agencies.
Loring reserves the right to change information within this document at any time without notice.
Pre-Installation and Site Preparation Guide General Notes