![Loring S15 Falcon Скачать руководство пользователя страница 28](http://html.mh-extra.com/html/loring/s15-falcon/s15-falcon_pre-installation-manual_1940790028.webp)
S15
Pre-Installation and Site Preparation Guide
Page 28 of 46
Loring Smart Roast Proprietary – This document is controlled by
Document Control. By printing this document, it will become a “Reference” copy.
Users are responsible for verifying that it is the latest revision available.
1008236 Rev B
Shipping the roaster according to Loring’s guidelines is required in
order to maintain product warranty.
Receiving Shipment
Shipping Notes
Pallet Jack
2 People
Forklift
S15 Minimum Capacity 3000 lbs
The customer is responsible for shipping arrangements, after notification from Loring that the
roaster is ready to be picked up for shipping. In particular, the customer should comply with the
following guidelines:
• Be sure to state that the roaster is to travel on a vehicle equipped with air ride suspension to
dampen the vibration and minimize the chance of damage during shipment.
»
For a cross-country shipment within the United States, Loring will not load the roaster
equipment onto a trailer that does not have air ride suspension.
»
For domestic shipments, request a nose / front load in order to minimize loading and
unloading at multiple terminals along the way, which will reduce the opportunity for potential
damage.
•
Overseas customers are advised to use a Full Container Load (FCL) shipment as this will
minimize the amount of transfers and handling by others.
• Handle the crates according to markings on crate for “This Side Up” and “Heavy End”.
• For safety, use 6’ forklift extensions.