![Loring S15 Falcon Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/loring/s15-falcon/s15-falcon_pre-installation-manual_1940790020.webp)
S15
Pre-Installation and Site Preparation Guide
Page 20 of 46
Loring Smart Roast Proprietary – This document is controlled by
Document Control. By printing this document, it will become a “Reference” copy.
Users are responsible for verifying that it is the latest revision available.
1008236 Rev B
Indoors
Floor
Flat and Level
No Soft Spots
Space Planning
Locate the coffee roaster in an area
that is protected from the elements
and from water intrusion. The
area does not need to be a fully
conditioned space.
Place the roaster on a flat, level, and firm
surface such as hard wood or concrete.
The floor should be strong enough to
support the total system weight of the
roaster and all supplemental equipment.
CAUTION: Use care when transporting the
equipment over bumpy or uneven flooring.
WARNING: Do not place the roaster on a soft
or unstable surface.