2
Set of Equipment supplied
Original operating manual, version 2/2016
– 1
Cryo-Gate
– 1 Connecting tube complete with connectors to connect the Cryo-Gate
to the CO
2
-tank, 5 m
– 1 mains cable 2 m Powercon True plug
– 1 Inline-Filter
– 1 Operating manual
Please check whether all the products you ordered are supplied.
Содержание Cryo-Gate
Страница 23: ...23...
Страница 24: ...24 a Look Solutions product...