User Manual
LogicSP-2-1 / LogicSP-2-2
Page 13 of 29
3. Initial Operation
Initial operation consists of the steps necessary to make a height-adjustable TV-Set Carrier
actually height adjustable with the LogicSP motor control. Prerequisites are:
•
The LogicSP control box is mounted (according to the instructions in section 2).
•
Motors and driving columns are integrated into the TV-Set carrier.
Danger:
The initial operation of the control box must be carried out by qualified
personnel only!
3.1. LogicSP Interfaces
The motor control box LogicSP (LogicSP-2-2 is capable of driving 2 motors) is equipped with
following interfaces:
3
3
Fig. 9 – LogicSP Interfaces
1. Interface to Motor 1 (up/down)
2. Interface to Motor 2 (right/left; only in the LogicSP-2-2)
3. TV Power Cable
4. Interface to Alternative Handset (the LogicSP Control Box usually comes with an integrated
foil handset) / Uplink to PC (serial) for Diagnostic Functions
5. Interface to Squeeze-Line (see page
Fehler! Textmarke nicht definiert.
)
6. Mains Supply
3.2. Initial Operation Procedure
Note:
Read this section carefully before connecting your control box to the TV-Set
Carrier.
For initial operation of the control box proceed as follows:
3.2.1.
Connect Drives
Connect the drive cables to the corresponding 8-pin DIN sockets (M1, M2).
Note:
When connecting, strictly stick to the sequence M1, M2! Connect the motor of the
lifting column to interface M1. If present, connect the motor for angle adjustment to
interface M2.