background image

Grain Bag Loader Set-up Instructions

3

N31088

Initial Set-up (Cont’d)

Remove the retaining clip (1) and pin (2) from both PTO
driveline storage cradles. Remove the driveline (3).

Reinstall the pins and retaining clips into the storage
cradles.

Raise or remove the PTO driveline guard (1). Remove
the guard by removing the two retaining clips (2) and pin
(3).

Install key (1) into the keyway of the grain bag loader
shaft. Align the PTO driveline coupler (2) with the key and
slide the driveline onto the shaft.

Install the cross bolt (3).

Tighten set screw (4) securing the PTO driveline to the
grain bag loader shaft.

NOTE:

Check cross bolt (3) and set screw (4) for
tightness after the first hour of operation.

Lower or install the PTO driveline guard.

Attach the safety chain from the PTO driveline shield to
the retaining clip (5).

CAUTION: 

Periodically check all guards, 

shields and structural members. Replace or 
repair anything that could cause a potential 
hazard.

1

2

3

1

2

2

3

CAUTION: 

Never use a steel hammer when 

connecting or disconnecting a PTO shaft.

1

2

5

4

3

Содержание Grain Bag Loader

Страница 1: ...is places added stress on one side of the grain bag and may cause the bag to overstretch It also prevents water from shedding away from and or running along the length of the grain bag Grain Bag Spaci...

Страница 2: ...ed in the storage position The operation hitch is also shipped in the upright storage position NOTE Lowering the operation hitch requires two people Remove the retaining clip 1 and pin and lower the o...

Страница 3: ...driveline coupler 2 with the key and slide the driveline onto the shaft Install the cross bolt 3 Tighten set screw 4 securing the PTO driveline to the grain bag loader shaft NOTE Check cross bolt 3 an...

Страница 4: ...es two people Release the latch 1 and lower the grain bag lift Press the bottom OUT of the switch 2 to lower the grain bag lift and press the top IN the switch to raise the lift Release the latch 1 an...

Страница 5: ...rage position Place the bottom of the grain bag into the tray Slide the grain bag into the tray until it contacts the back of the tray Raise the bag pan until there is approximately 1 1 2 in 38 1 mm o...

Страница 6: ...rator in braking the machine Move the grain bag loader into position facing up the slope Stop the tractor and exit the tractor Place a marker at the starting edge of the grain bag and stretch it along...

Страница 7: ...nd then fold it towards the center of the bag Place a board underneath the folded end of the bag the board should be long enough to reach the entire width of the bag then place a second board on top o...

Страница 8: ...derneath and that the grain is flowing to the end of the bag creating the seal Adjusting The Bag Pan Height Using the tractor s hydraulics raise or lower the machine so that the bag pan height is 8 to...

Страница 9: ...0 13 ft 3 1 3 9 m of the grain bag empty for sealing NOTE The entire 10 13 ft 3 1 3 9 m of unused bag is not needed for sealing the bag but will aid in the unloading process Seal the grain bag with th...

Страница 10: ...10 Grain Bag Loader Instructions...

Отзывы: