Installation & Start-Up, cont.
3
20
3.2
SPACE & UTILITY
REQUIREMENTS
EXHAUST AIRFLOW
DOOR SWINGS FROM RIGHT TO LEFT
POWER INPUT C
POWER INPUT CORD
P/N 98008
LB-11003
Configured Specifically For Use
With This Cure Chamber
P/N 984138
CHAMBER POWER
OFF
ON
CYCLE STOP
CYCLE START
SHUTTER TIMER
7216
WARNING
ULTRAVIOLET LIGHT
This unit has been designed to
prevent user exposure to UV light.
READ OPERATOR'S MANUAL BEFORE USE
LAMP CONTROL
POWER
O
I
PHOTOCELL
TEST POINTS
(0-12 VDC)
STANDBY
/RESET
LAMP OFF
+
-
LAMP ON
SYSTEM
UNIT
P300M POWER SUPPLY
TEST POINTS
MAGNETRON
(0-800 mVDC)
+
-
INDICATOR TEST
LAMP OUT
PWR IMBAL
SYS BLWR
EXT INTLK
RF INTLK
PWR ERROR
BLWR PRESSURE
PS TEMP
20.00
18 3/8
21 1/2
5 INCH EXHAUST VENT
HOSE, MAXIMUM LENGTH
40 FEET, NO INCOMING
POSITIVE PRESSURE
13.63
7.25
Figure 9. Top View
Figure 10. Front View
Electrical Service Requirements
220 Volt 15 Amp Circuit
Single Phase
120 Volts 15 Amp Circuit
984135 Zeta 7215 & 7216 manl 8/3/00 3:24 PM Page 22