background image

 

Storage Tank Installation and Operation Manual

  

7

Do not install a manual shut off valve 
between the relief valve and the discharge.  
Doing so could cause serious injury or 
death if the relief valve released and the 
manual valve was closed.  This would 
cause excessive build-up of pressure in 
the storage tank which could result in an 
explosion.

Drain

The tanks’ drain connection must be piped to a suitable floor 
drain.  Brass drain cocks are acceptable.  A brass full port ball 
valve is recommended to improve water flow.

Completing installation

Installation of the Lochinvar Heat Pump Storage Tank is 
now complete. All documentation supplied with the unit 
should be passed along to maintenance personnel for future 
reference.

Piping the relief valve 

(Relief valve is field 

supplied)

All Lochinvar Heat Pump Storage Tanks are equipped with a 
relief valve tapping on the tank. The valve should be piped to a 
discharge line leading to a suitable drain.  Piping the pressure 
relief valve to a suitable drain will prevent both water and heat 
damage to the unit, as well as reduce the risk of injury from 
released heated water. The pipe must be of adequate size to 
properly handle the capacity of the relief valve and discharge 
line.

Check local codes to assure compliance. If a check valve has 
been installed on the inlet water line, thermal expansion may 
take place causing build up of excessive pressure when the 
water is being heated. This expansion will cause the relief 
valve to open, releasing hot water to the discharge line.  A 
properly sized expansion tank must be installed to protect the 
system from water expansion.

 WARNING

2  

Installation 

(continued)

Aquastat bulbwell

Review the controls for the hot water source equipment.  Some 
equipment or systems designs will require an independent 
aquastat (field supplied) to control the equipment. The 
aquastat may be surface mounted onto the sheet metal jacket 
of the tank or a nearby surface. Water sensing probes may be 
installed into one (1) of the four (4) dry bulbwells supplied 
with all Lochinvar Heat Pump Storage Tanks. The equipment 
may employ a water sensing thermistor. The thermistors 
would be installed into any one of the dry bulbwells then 
wired back to the hot water equipment.

In installations with more than one water heater, more than 
one probe may need to be installed in the storage tank. 

 

The super bulbwell has a bulb depth of 7-5/16" and can 
accommodate a 3/8" diameter sensor/bulb.  An aluminum 
adapter sleeve is supplied to allow a 1/4" diameter sensor well 
to be used.

Содержание Thermal-Stor 100 Series

Страница 1: ...he information contained in this manual is intended for use by qualified professional installers or service technicians Consult your local expert for proper installation or service procedures Save thi...

Страница 2: ...ain 7 Completing the installation 7 3 OPERATION 8 Startup procedure 8 Shutdown procedure 8 4 INSPECTION 9 5 MAINTENANCE 10 Flushing the tank 10 Cleaning the tank 10 11 Magnesium anode rod inspection 1...

Страница 3: ...HP750G and HP1000G Tank Orientation Lochinvar Heat Pump Storage Tanks are constructed in a vertical orientation Tank Lining Lochinvar Heat Pump Storage Tanks are constructed with glass lining ASME Al...

Страница 4: ...ttempting any procedures 5 Assure that all incoming and outgoing water lines have been shut off at the manual shutoff valves WARNING Heated water presents situations that can be very dangerous due to...

Страница 5: ...r heater Tapping locations on the water heater may vary by product or manufacturer Figure 2 1_Single Pass Piping Diagram One Heater One Tank MIXING VALVE CHECK VALVE EXPANSION TANK ISOLATION VALVE CIR...

Страница 6: ...cold water supply to the recirculation piping between the heater s and the tank s NOTICE If the cold water supply to the system is equipped with an in line check valve or backflow preventer a suitable...

Страница 7: ...y handle the capacity of the relief valve and discharge line Check local codes to assure compliance If a check valve has been installed on the inlet water line thermal expansion may take place causing...

Страница 8: ...nstallation operation and maintenance procedures to avoid possible injury or death Shutdown procedure 1 Turn off all power to the circulating pump and the hot water source controls 2 Close all valves...

Страница 9: ...nections RECOMMENDED INSPECTIONS To Be Inspected Time Interval Per Manufacturer Specs Weekly Monthly Quarterly Annually Circulating Pump Gauges Pressure Temperature Lines Inlet Outlet Return Pressure...

Страница 10: ...es supplied in glass lined storage tanks Hot water will be released under pressure Avoid contact with the hot discharge water to prevent the risk of severe scald injury Flushing the storage tank Since...

Страница 11: ...in the tank 7 Use hand tools to remove all sediment from the interior of the tank Use care not to damage the interior lining of the storage tank 8 Use a water hose to flush the remaining sediment from...

Страница 12: ...t seem feasible to replace inlet and outlet water lines and shutoff valves without shutting down the entire unit it is not advised Unless the unit is completely shut down and the water and the energy...

Страница 13: ...13 Storage Tank Installation and Operation Manual Notes...

Страница 14: ...Notes 14 Storage Tank Installation and Operation Manual...

Страница 15: ...15 Notes Storage Tank Installation and Operation Manual...

Страница 16: ...vision Notes Revision A PCP 3000042118 CN 500030128 initial release Revision B PCP 3000045095 CN 500032686 reflects the addition of Series 100 to the manual cover MM 100339374_DIR 2000596325_Rev B 04...

Отзывы: