13
DANGER
TEMPERATURE SETTING SHOULD NOT EXCEED SAFE USE
TEMPERATURE AT FIXTURES. SEE WATER TEMPERATURE CONTROL
WARNING ON PAGE 20. IF HIGHER PREHEAT TEMPERATURES ARE
NECESSARY TO OBTAIN ADEQUATE BOOSTER OUTPUT, ADD AN
ANTI-SCALD VALVE FOR HOT WATER SUPPLIED TO FIXTURES.
TWO TEMPERATURE - ONE HEATER HIGH TEMPERATURE STORAGE
WITH RECIRCULATION OF SANITIZING LOOP
NOTE 1: TOGGLE SWITCH CONTROLS 180°F (82°C) WATER
CIRCULATION. INSTALL ON OR CLOSE TO DISHWASHING
MACHINE. TOGGLE SWITCH MUST BE CLOSED (ON)
DURING THE RINSE OPERATION AND OPEN (OFF) WHEN
DISHWASHER IS NOT OPERATING OR WHEN ON LONG
STANDBY.
NOTE 2: INSTALL LINE TEMPERATURE CONTROL IN AN
UNINSULATED TEE BEYOND THE DISHWASHING MACHINE
TAKEOFF IN THE SANITIZING LOOP. CONTROL SHOULD
BE SET AT 185°F (85°C).
NOTE 3: ADJUST PLUG COCK SO THE SANITIZING LOOP FLOW
RATE DOES NOT CAUSE UNNECESSARY TURBULENCE
IN THE TANK.
* TEMPERED WATER LOOP, IF USED, CONNECT TO
POINT “A”.
**PIPE RELIEF VALVE TO OPEN DRAIN.
INSTALL IN ACCORDANCE WITH LOCAL CODES.
CAUTION: IF BUILDING COLD WATER SUPPLY HAS A BACKFLOW
PREVENTER, CHECK VALVE OR WATER METER WITH CHECK
VALVE. PROVISIONS FOR THERMAL EXPANSION OF WATER
IN THE HOT WATER SYSTEM MUST BE PROVIDED.